A platform for research: civil engineering, architecture and urbanism
Node fixing device at upper end of inclined strut of cantilever scaffold and construction method of node fixing device
The invention discloses a fixing device for the upper end of an inclined strut of a cantilever scaffold and a construction method, and particularly relates to the technical field of building construction. The connecting assembly comprises a first fastening piece, a second fastening piece and an adjusting piece. The connecting assembly is used for fastening and connecting the inclined strut and the main beam before welding, the operation that the inclined strut needs to be lifted all the time through a tower crane in the welding process is avoided, the accuracy of welding operation is improved, the quality of a welding seam is guaranteed, the safety risk of welding operation and the site construction difficulty are reduced, and meanwhile, the welding efficiency is improved. And the connecting assembly can be adjusted to be matched with the direction in which the inclined strut needs to be installed, the construction efficiency is improved, and the device is suitable for construction of various types of cantilever scaffolds and has high popularization value.
本发明公开了一种用于悬挑脚手架斜撑上端的固定装置及施工方法,具体涉及建筑施工技术领域,其包括主体组件,包括主梁、斜撑;连接组件,包括第一紧固件、第二紧固件以及调整件。本发明通过使用连接组件在焊接前将斜撑与主梁进行紧固连接,避免了焊接过程中需要使用塔吊一直吊着斜撑操作,增加了焊接作业的准确性,保证了焊缝质量,降低了焊接作业的安全风险和现场施工难度,同时,又能调整连接组件与斜撑需要安装的方向相匹配,提高了施工效率,适用于各种类型的悬挑脚手架施工,具有较高的推广价值。
Node fixing device at upper end of inclined strut of cantilever scaffold and construction method of node fixing device
The invention discloses a fixing device for the upper end of an inclined strut of a cantilever scaffold and a construction method, and particularly relates to the technical field of building construction. The connecting assembly comprises a first fastening piece, a second fastening piece and an adjusting piece. The connecting assembly is used for fastening and connecting the inclined strut and the main beam before welding, the operation that the inclined strut needs to be lifted all the time through a tower crane in the welding process is avoided, the accuracy of welding operation is improved, the quality of a welding seam is guaranteed, the safety risk of welding operation and the site construction difficulty are reduced, and meanwhile, the welding efficiency is improved. And the connecting assembly can be adjusted to be matched with the direction in which the inclined strut needs to be installed, the construction efficiency is improved, and the device is suitable for construction of various types of cantilever scaffolds and has high popularization value.
本发明公开了一种用于悬挑脚手架斜撑上端的固定装置及施工方法,具体涉及建筑施工技术领域,其包括主体组件,包括主梁、斜撑;连接组件,包括第一紧固件、第二紧固件以及调整件。本发明通过使用连接组件在焊接前将斜撑与主梁进行紧固连接,避免了焊接过程中需要使用塔吊一直吊着斜撑操作,增加了焊接作业的准确性,保证了焊缝质量,降低了焊接作业的安全风险和现场施工难度,同时,又能调整连接组件与斜撑需要安装的方向相匹配,提高了施工效率,适用于各种类型的悬挑脚手架施工,具有较高的推广价值。
Node fixing device at upper end of inclined strut of cantilever scaffold and construction method of node fixing device
一种悬挑脚手架斜撑上端的节点固定装置及其施工方法
JIANG WEIJIE (author) / WU ZHIJIE (author) / KUANG YIJING (author) / LIU WENNA (author) / LI YUE (author) / JIAN TIANBI (author)
2024-02-06
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2020
|Recyclable prefabricated wallboard inclined strut fixing piece and construction method thereof
European Patent Office | 2024
|Fixing seat device for mounting stand column and inclined strut
European Patent Office | 2024
|