A platform for research: civil engineering, architecture and urbanism
Steel structure beam column joint device
The invention relates to the technical field of buildings, in particular to a steel structure beam column joint device which comprises a steel column, two steel beams and a connecting part. Inserting sleeves are mounted on the connecting plates, and the tail end of the steel beam penetrates through the space between the two inserting sleeves; detachable connecting frames are arranged at the upper end and the lower end of the exterior of the sleeve; connecting plates are fixed to the tail ends of the steel beams and abut against the outer walls of the sleeves, inserting plates are inserted into the inserting sleeves and fixed to the steel beams through first split bolts, connecting frames are arranged at the upper ends and the lower ends of the inserting plates, the inserting plates are inserted into inserting openings of the connecting frames, and the two connecting frames can be stably limited outside the sleeves under the limitation of third split bolts; the connecting plates and the steel beams can be stably limited on the two sides of the sleeve, so that the steel beams can be stably mounted on the front side and the rear side of the steel column; by means of the design, the connecting strength between the steel beam and the steel column is guaranteed, the connecting safety and stability are guaranteed, and installation convenience is also guaranteed.
本发明涉及建筑技术领域,具体为一种钢结构梁柱节点装置,包括钢柱、两个钢梁和连接部;连接板上均安装有插套,钢梁末端从两个插套之间穿过;套筒的外部位于上下两端处均设有可拆卸的连接架;钢梁的末端固定有连接板,连接板抵紧套筒的外壁,插板插入至插套并通过第一对拉螺栓与钢梁固定,插板上下两端设置了连接架,插板插入至连接架的插口内在第三对拉螺栓的限制下,可以将两个连接架稳定地限制在套筒外部,进而可以将连接板和钢梁稳定的限制在套筒两侧,从而可以将钢梁稳定的安装在钢柱的前后两侧;该设计既保证了钢梁与钢柱之间的连接强度,保证了连接的安全性和稳定性,也保证了安装的便利性。
Steel structure beam column joint device
The invention relates to the technical field of buildings, in particular to a steel structure beam column joint device which comprises a steel column, two steel beams and a connecting part. Inserting sleeves are mounted on the connecting plates, and the tail end of the steel beam penetrates through the space between the two inserting sleeves; detachable connecting frames are arranged at the upper end and the lower end of the exterior of the sleeve; connecting plates are fixed to the tail ends of the steel beams and abut against the outer walls of the sleeves, inserting plates are inserted into the inserting sleeves and fixed to the steel beams through first split bolts, connecting frames are arranged at the upper ends and the lower ends of the inserting plates, the inserting plates are inserted into inserting openings of the connecting frames, and the two connecting frames can be stably limited outside the sleeves under the limitation of third split bolts; the connecting plates and the steel beams can be stably limited on the two sides of the sleeve, so that the steel beams can be stably mounted on the front side and the rear side of the steel column; by means of the design, the connecting strength between the steel beam and the steel column is guaranteed, the connecting safety and stability are guaranteed, and installation convenience is also guaranteed.
本发明涉及建筑技术领域,具体为一种钢结构梁柱节点装置,包括钢柱、两个钢梁和连接部;连接板上均安装有插套,钢梁末端从两个插套之间穿过;套筒的外部位于上下两端处均设有可拆卸的连接架;钢梁的末端固定有连接板,连接板抵紧套筒的外壁,插板插入至插套并通过第一对拉螺栓与钢梁固定,插板上下两端设置了连接架,插板插入至连接架的插口内在第三对拉螺栓的限制下,可以将两个连接架稳定地限制在套筒外部,进而可以将连接板和钢梁稳定的限制在套筒两侧,从而可以将钢梁稳定的安装在钢柱的前后两侧;该设计既保证了钢梁与钢柱之间的连接强度,保证了连接的安全性和稳定性,也保证了安装的便利性。
Steel structure beam column joint device
一种钢结构梁柱节点装置
CHEN NING (author) / CHENG GONG (author) / XU BING (author) / CHEN MUYE (author) / ZHANG SHOUKAI (author) / LIU XINGTAO (author) / DONG YUZHI (author) / WENG LIQIN (author) / SUN HUALIN (author) / ZHENG MINGYUE (author)
2024-02-13
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
REINFORCED CONCRETE COLUMN/STEEL COLUMN/STEEL BEAM JOINT STRUCTURE
European Patent Office | 2016
|