A platform for research: civil engineering, architecture and urbanism
Scaffold assembly process assisted by embedded type wall connecting piece
The invention provides a scaffold assembly process assisted by embedded type wall connecting pieces, which comprises the following steps of: pre-embedding a plurality of embedded type wall connecting pieces in a wall body or a beam body by utilizing a template; when the strength of the concrete in the belt formwork reaches a set value, each embedded wall connecting piece is rotationally connected with a connecting piece, and the connecting pieces extend out of the concrete structure; the embedded wall connecting piece is fixedly connected with a formwork and a scaffold for construction through connecting pieces, a concrete structure serves as a supporting body, and the arranged scaffold and the formwork are assembled; the embedded wall connecting piece comprises an embedded end and an insertion end, after the scaffold is used up and the formwork is poured, the insertion end is pulled out, and the embedded end is embedded in a poured wall or beam.
本发明提供了埋置式连墙件辅助的脚手架装配工艺,包括以下步骤:利用模板,于墙体或梁体内预埋若干个埋置式连墙件;带模板内混凝土强度达到设定值时,每个埋置式连墙件分别转动连接有连接件,且所述连接件伸出混凝土结构外;利用连接件将埋置式连墙件与模板以及施工用脚手架分别进行固结,以混凝土结构作为支撑体,装配设置的脚手架以及模板;所述埋置式连墙件包括预埋端以及插入端,脚手架使用完且模板浇筑完成后,插入端拔出,预埋端预埋于浇筑的墙体或梁体内。
Scaffold assembly process assisted by embedded type wall connecting piece
The invention provides a scaffold assembly process assisted by embedded type wall connecting pieces, which comprises the following steps of: pre-embedding a plurality of embedded type wall connecting pieces in a wall body or a beam body by utilizing a template; when the strength of the concrete in the belt formwork reaches a set value, each embedded wall connecting piece is rotationally connected with a connecting piece, and the connecting pieces extend out of the concrete structure; the embedded wall connecting piece is fixedly connected with a formwork and a scaffold for construction through connecting pieces, a concrete structure serves as a supporting body, and the arranged scaffold and the formwork are assembled; the embedded wall connecting piece comprises an embedded end and an insertion end, after the scaffold is used up and the formwork is poured, the insertion end is pulled out, and the embedded end is embedded in a poured wall or beam.
本发明提供了埋置式连墙件辅助的脚手架装配工艺,包括以下步骤:利用模板,于墙体或梁体内预埋若干个埋置式连墙件;带模板内混凝土强度达到设定值时,每个埋置式连墙件分别转动连接有连接件,且所述连接件伸出混凝土结构外;利用连接件将埋置式连墙件与模板以及施工用脚手架分别进行固结,以混凝土结构作为支撑体,装配设置的脚手架以及模板;所述埋置式连墙件包括预埋端以及插入端,脚手架使用完且模板浇筑完成后,插入端拔出,预埋端预埋于浇筑的墙体或梁体内。
Scaffold assembly process assisted by embedded type wall connecting piece
埋置式连墙件辅助的脚手架装配工艺
CHEN GUOPING (author) / FAN YIHUA (author) / XIN YONGJIANG (author) / CHEN KUN (author) / GU LINGFENG (author) / LI XINZHAO (author)
2024-02-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste