Construction method for protecting waste slag field based on hard rock stratum tunnel hole slag material
The invention discloses a construction method for protecting a waste slag yard based on a hard rock stratum tunnel hole slag material, and belongs to the technical field of tunnel construction. The method comprises the steps that the site of the waste slag yard is planned and arranged; the tunnel is subjected to early-stage construction to generate hole slag, and the slag is discarded on the site of the slag discarding site; crushing the hole slag on the waste slag field, and sorting the hole slag to obtain hole slag filler; constructing a first-layer protective net cage retaining wall and performing first-layer waste slag operation until a first-layer waste slag forming surface is formed; second-layer protective net cage retaining wall construction and second-layer waste slag operation are conducted on the first-layer waste slag forming face till the first-layer waste slag forming face is formed; planning the site of the waste slag site; due to the fact that the protective net cage retaining wall is constructed through the tunnel hole slag and the protective net cage, the technical problems that construction of the slag retaining wall of the waste slag field affects the progress and causes resource waste are effectively solved, then rapid construction of the tunnel hole slag protection waste slag field is achieved, the construction progress is improved, and resources are reasonably utilized.
本申请公开了一种基于硬岩地层隧道洞渣材料防护弃渣场的施工方法,属于隧道施工技术领域,所述方法包括:规划并整理弃渣场的场地;隧道进行前期施工产生洞渣,并在弃渣场的场地上进行弃渣;对弃渣场上的洞渣进行破碎、分选洞渣获得洞渣填料;第一层防护网箱挡墙施工及第一层弃渣作业直至形成第一层弃渣成型面;在第一层弃渣成型面上进行第二层防护网箱挡墙施工及第二层弃渣作业直至形成第一层弃渣成型面;弃渣场的场地规划;本申请由于采用了利用隧道洞渣及防护网箱构筑防护网箱挡墙,有效解决了弃渣场挡渣墙施工影响进度而且造成资源浪费的技术问题,进而实现了利用隧道洞渣防护弃渣场的快速施工,提高施工进度另外合理利用资源。
Construction method for protecting waste slag field based on hard rock stratum tunnel hole slag material
The invention discloses a construction method for protecting a waste slag yard based on a hard rock stratum tunnel hole slag material, and belongs to the technical field of tunnel construction. The method comprises the steps that the site of the waste slag yard is planned and arranged; the tunnel is subjected to early-stage construction to generate hole slag, and the slag is discarded on the site of the slag discarding site; crushing the hole slag on the waste slag field, and sorting the hole slag to obtain hole slag filler; constructing a first-layer protective net cage retaining wall and performing first-layer waste slag operation until a first-layer waste slag forming surface is formed; second-layer protective net cage retaining wall construction and second-layer waste slag operation are conducted on the first-layer waste slag forming face till the first-layer waste slag forming face is formed; planning the site of the waste slag site; due to the fact that the protective net cage retaining wall is constructed through the tunnel hole slag and the protective net cage, the technical problems that construction of the slag retaining wall of the waste slag field affects the progress and causes resource waste are effectively solved, then rapid construction of the tunnel hole slag protection waste slag field is achieved, the construction progress is improved, and resources are reasonably utilized.
本申请公开了一种基于硬岩地层隧道洞渣材料防护弃渣场的施工方法,属于隧道施工技术领域,所述方法包括:规划并整理弃渣场的场地;隧道进行前期施工产生洞渣,并在弃渣场的场地上进行弃渣;对弃渣场上的洞渣进行破碎、分选洞渣获得洞渣填料;第一层防护网箱挡墙施工及第一层弃渣作业直至形成第一层弃渣成型面;在第一层弃渣成型面上进行第二层防护网箱挡墙施工及第二层弃渣作业直至形成第一层弃渣成型面;弃渣场的场地规划;本申请由于采用了利用隧道洞渣及防护网箱构筑防护网箱挡墙,有效解决了弃渣场挡渣墙施工影响进度而且造成资源浪费的技术问题,进而实现了利用隧道洞渣防护弃渣场的快速施工,提高施工进度另外合理利用资源。
Construction method for protecting waste slag field based on hard rock stratum tunnel hole slag material
一种基于硬岩地层隧道洞渣材料防护弃渣场的施工方法
HE HONGSHENG (author) / ZHANG ZIGUANG (author) / ZHANG JIESHENG (author) / ZHANG CHENG (author) / DING YAWEN (author) / ZHANG MENG (author) / LENG BIAO (author) / PENG LIANGXUE (author) / DONG FENGCHUN (author) / ZHANG LEI (author)
2024-02-20
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Ecological restoration structure of waste slag area of rock salt stratum
European Patent Office | 2020
|Hard rock stratum square pile hole forming pouring construction method
European Patent Office | 2021
|European Patent Office | 2024
|