The invention discloses a construction method of a reinforced concrete and steel structure mixed frame beam. The construction method comprises the steps that S1, scaffolds are erected on the two sides of the lower portion of a frame reinforced concrete main beam; s2, a beam bottom die and beam bottom steel bar binding are installed on the frame reinforced concrete main beam; s3, adjustable connecting devices are installed at the two ends or one end of the frame steel secondary beam to be installed on the ground; s4, first frame steel secondary beams on the same axis are hoisted; s5, second frame steel secondary beams at the two ends of the first frame steel secondary beams are hoisted, and the plane positions of the frame steel secondary beams are adjusted through adjustable connecting devices at the two ends of the first frame steel secondary beams; s6, frame steel secondary beams of other axes are installed; s7, binding reinforcing steel bars and stirrups at the upper part of the frame reinforced concrete main beam, erecting a beam side template, laying a floor support plate and binding reinforcing steel bars of the floor support plate; and S8, frame reinforced concrete girder and floor support plate concrete is poured. One-time pouring is achieved, and the construction period is shortened.
本发明公开了一种钢筋混凝土和钢结构混合的框架梁的施工方法,包括:步骤S1,在框架钢筋混凝土主梁的下部两侧搭设脚手架;步骤S2,在框架钢筋混凝土主梁安装其梁底模以及其梁底钢筋绑扎;步骤S3,在地面把待安装的框架钢次梁两端或一端安装可调连接装置;步骤S4,吊装同一轴线的第一框架钢次梁;步骤S5,吊装第一框架钢次梁两端的第二框架钢次梁,通过第一框架钢次梁两端的可调连接装置调整框架钢次梁平面位置;步骤S6,安装其他轴线的框架钢次梁;步骤S7,绑扎框架钢筋混凝土主梁上部钢筋及箍筋,并支设梁侧模板,铺设楼承板及绑扎楼承板钢筋;步骤S8,浇注框架钢筋混凝土主梁及楼承板混凝土。一次性浇注,节约了工期。
Construction method of reinforced concrete and steel structure mixed frame beam
The invention discloses a construction method of a reinforced concrete and steel structure mixed frame beam. The construction method comprises the steps that S1, scaffolds are erected on the two sides of the lower portion of a frame reinforced concrete main beam; s2, a beam bottom die and beam bottom steel bar binding are installed on the frame reinforced concrete main beam; s3, adjustable connecting devices are installed at the two ends or one end of the frame steel secondary beam to be installed on the ground; s4, first frame steel secondary beams on the same axis are hoisted; s5, second frame steel secondary beams at the two ends of the first frame steel secondary beams are hoisted, and the plane positions of the frame steel secondary beams are adjusted through adjustable connecting devices at the two ends of the first frame steel secondary beams; s6, frame steel secondary beams of other axes are installed; s7, binding reinforcing steel bars and stirrups at the upper part of the frame reinforced concrete main beam, erecting a beam side template, laying a floor support plate and binding reinforcing steel bars of the floor support plate; and S8, frame reinforced concrete girder and floor support plate concrete is poured. One-time pouring is achieved, and the construction period is shortened.
本发明公开了一种钢筋混凝土和钢结构混合的框架梁的施工方法,包括:步骤S1,在框架钢筋混凝土主梁的下部两侧搭设脚手架;步骤S2,在框架钢筋混凝土主梁安装其梁底模以及其梁底钢筋绑扎;步骤S3,在地面把待安装的框架钢次梁两端或一端安装可调连接装置;步骤S4,吊装同一轴线的第一框架钢次梁;步骤S5,吊装第一框架钢次梁两端的第二框架钢次梁,通过第一框架钢次梁两端的可调连接装置调整框架钢次梁平面位置;步骤S6,安装其他轴线的框架钢次梁;步骤S7,绑扎框架钢筋混凝土主梁上部钢筋及箍筋,并支设梁侧模板,铺设楼承板及绑扎楼承板钢筋;步骤S8,浇注框架钢筋混凝土主梁及楼承板混凝土。一次性浇注,节约了工期。
Construction method of reinforced concrete and steel structure mixed frame beam
一种钢筋混凝土和钢结构混合的框架梁的施工方法
WU SHIJIONG (author) / YIN YAHONG (author) / FAN TENGTENG (author) / GUAN ZHENQIANG (author) / YANG FAN (author) / DING MEIZHI (author)
2024-02-20
Patent
Electronic Resource
Chinese
STEEL FRAME CONCRETE BEAM STRUCTURE AND CONSTRUCTION METHOD OF STEEL FRAME CONCRETE BEAM STRUCTURE
European Patent Office | 2022
|H-SECTION STEEL BRACE JOINT STRUCTURE, REINFORCED CONCRETE COLUMN/STEEL BEAM MIXED FRAME
European Patent Office | 2023
|H-SECTION STEEL BRACE JOINT STRUCTURE, REINFORCED CONCRETE COLUMN/STEEL BEAM MIXED FRAME
European Patent Office | 2022
|REINFORCED-CONCRETE COLUMN-STEEL FRAME BEAM JOINING STRUCTURE
European Patent Office | 2017
|European Patent Office | 2015
|