Drainage system of power transmission line iron tower
The invention relates to the technical field of power transmission line maintenance, and particularly discloses a power transmission line iron tower drainage system which comprises an iron tower foundation, a stone sand layer, a siphon rainwater hopper, a water pipe and a water storage module. The iron tower foundation is arranged on the stone sand layer; the stone sand layer is provided with a rainwater groove; the siphon rainwater hopper is arranged in the rainwater groove; the water storage module is arranged below the stone sand layer; and the water pipe is connected with the siphon roof drain and the water storage module. According to the scheme, the siphon roof drain is applied to an iron tower drainage system, water-gas separation can be achieved, water pipe blocking is avoided, and therefore drainage stability is improved; meanwhile, rainwater can be stored through the water storage module, stable and continuous operation of the drainage system is guaranteed, and the problem that an existing iron tower drainage system is poor in stability is solved.
本申请涉及输电线路维护技术领域,具体公开了一种输电线路铁塔排水系统,包括:铁塔基础、石砂层、虹吸雨水斗、水管与储水模块;所述铁塔基础设置于所述石砂层上;所述石砂层设置有雨水槽;所述虹吸雨水斗设置于所述雨水槽内;所述储水模块设置于所述石砂层下方;所述水管连接所述虹吸雨水斗与所述储水模块。本方案通过将虹吸雨水斗应用于铁塔排水系统,能够实现水气分离,避免水管封堵从而提高排水的稳定性;同时,通过储水模块能够将雨水储存,保证排水系统的稳定持续运行,解决现有的铁塔排水系统稳定性较差的问题。
Drainage system of power transmission line iron tower
The invention relates to the technical field of power transmission line maintenance, and particularly discloses a power transmission line iron tower drainage system which comprises an iron tower foundation, a stone sand layer, a siphon rainwater hopper, a water pipe and a water storage module. The iron tower foundation is arranged on the stone sand layer; the stone sand layer is provided with a rainwater groove; the siphon rainwater hopper is arranged in the rainwater groove; the water storage module is arranged below the stone sand layer; and the water pipe is connected with the siphon roof drain and the water storage module. According to the scheme, the siphon roof drain is applied to an iron tower drainage system, water-gas separation can be achieved, water pipe blocking is avoided, and therefore drainage stability is improved; meanwhile, rainwater can be stored through the water storage module, stable and continuous operation of the drainage system is guaranteed, and the problem that an existing iron tower drainage system is poor in stability is solved.
本申请涉及输电线路维护技术领域,具体公开了一种输电线路铁塔排水系统,包括:铁塔基础、石砂层、虹吸雨水斗、水管与储水模块;所述铁塔基础设置于所述石砂层上;所述石砂层设置有雨水槽;所述虹吸雨水斗设置于所述雨水槽内;所述储水模块设置于所述石砂层下方;所述水管连接所述虹吸雨水斗与所述储水模块。本方案通过将虹吸雨水斗应用于铁塔排水系统,能够实现水气分离,避免水管封堵从而提高排水的稳定性;同时,通过储水模块能够将雨水储存,保证排水系统的稳定持续运行,解决现有的铁塔排水系统稳定性较差的问题。
Drainage system of power transmission line iron tower
一种输电线路铁塔排水系统
DING CHENXING (author) / ZHANG XIAOQING (author) / SONG TINGHAN (author) / LIU ZHIJIAN (author) / ZENG XIANKAI (author) / LIU XIN (author) / PAN QIAO (author) / YE XIANG (author) / ZHANG TAO (author) / LI YANFEI (author)
2024-02-23
Patent
Electronic Resource
Chinese