Construction method for replacing concrete structure by section steel of fabricated infilled wall structure
The invention discloses a construction method for replacing a concrete structure with structural steel of an assembly type infilled wall. The construction method comprises the steps of constructional column arrangement, paying-off positioning, machining, assembling, welding, constructional column and door side column installation, door lintel and waist beam installation, welding point treatment, ALC autoclaved aerated concrete slab installation and the like. According to the construction method, concrete constructional column, door lintel and waist beam construction in a traditional scheme is changed into square steel column and square steel beam construction. Before the ALC concrete aerated plate is installed, a constructional column, a door lintel, a waist beam and the like are installed in advance. And in the later period, the ALC concrete air-entrapping plate greatly improves the construction efficiency, so that the effects of advancing the construction period, saving labor and saving cost are achieved.
本发明公开了一种装配式填充墙结构型钢替代混凝土构造施工方法,包括构造柱设置、放线定位、加工、组装、焊接、构造柱、门边柱安装、门过梁、腰梁安装、焊接点处理、ALC蒸压加气混凝土板安装等步骤。本发明将传统方案中的混凝土构造柱、门过梁、腰梁的做法,改为方钢柱、方钢梁施工。在安装ALC混凝土加气板前,预先安装构造柱、门过梁、腰梁等。在后期ALC混凝土加气板,大大提高施工效率,以达到工期提前,节约人工,节约成本的效果。
Construction method for replacing concrete structure by section steel of fabricated infilled wall structure
The invention discloses a construction method for replacing a concrete structure with structural steel of an assembly type infilled wall. The construction method comprises the steps of constructional column arrangement, paying-off positioning, machining, assembling, welding, constructional column and door side column installation, door lintel and waist beam installation, welding point treatment, ALC autoclaved aerated concrete slab installation and the like. According to the construction method, concrete constructional column, door lintel and waist beam construction in a traditional scheme is changed into square steel column and square steel beam construction. Before the ALC concrete aerated plate is installed, a constructional column, a door lintel, a waist beam and the like are installed in advance. And in the later period, the ALC concrete air-entrapping plate greatly improves the construction efficiency, so that the effects of advancing the construction period, saving labor and saving cost are achieved.
本发明公开了一种装配式填充墙结构型钢替代混凝土构造施工方法,包括构造柱设置、放线定位、加工、组装、焊接、构造柱、门边柱安装、门过梁、腰梁安装、焊接点处理、ALC蒸压加气混凝土板安装等步骤。本发明将传统方案中的混凝土构造柱、门过梁、腰梁的做法,改为方钢柱、方钢梁施工。在安装ALC混凝土加气板前,预先安装构造柱、门过梁、腰梁等。在后期ALC混凝土加气板,大大提高施工效率,以达到工期提前,节约人工,节约成本的效果。
Construction method for replacing concrete structure by section steel of fabricated infilled wall structure
装配式填充墙结构型钢替代混凝土构造施工方法
CHEN CHAO (author) / LI DESHENG (author) / LU SHIKAI (author) / WU YUBO (author) / YANG CHEN (author)
2024-02-23
Patent
Electronic Resource
Chinese
Fabricated concrete special-shaped column frame infilled wall structure
European Patent Office | 2022
|Sill coping concrete structure of frame structure infilled wall and construction method
European Patent Office | 2015
|Secondary structure infilled wall construction equipment
European Patent Office | 2024
|Cast-in-place concrete infilled wall structure of frame structure and construction method
European Patent Office | 2024
|