A platform for research: civil engineering, architecture and urbanism
Elevator shaft formwork erecting device and construction method
The invention belongs to the technical field of basement foundation pits, and particularly relates to an elevator shaft formwork erecting device and a construction method. Comprising an outer supporting frame, an inner supporting device, a side edge plugging plate and a plugging bottom plate, the side edge plugging plate and the plugging bottom plate are arranged in the outer supporting frame, the side edge plugging plate and the plugging bottom plate are connected and fixed in a right-angle mode, the inner supporting device is fixed in the outer supporting frame and makes contact with and is fixed to the side edge plugging plate, and a plurality of vibrating holes are formed in the plugging bottom plate. And bottom concrete can be stirred through round steel to prevent overflow. The method has the advantages and positive effects that the construction period is shortened, the construction cost is greatly reduced, the quality of concrete at the bottom plate positions of the elevator shaft and the water-collecting well is guaranteed, and the risk of leakage in the later period is avoided.
本发明属于地下室基坑技术领域,更具体地说,尤其是涉及一种电梯井支模装置及施工方法。包括外支撑架和内支撑装置,侧边封堵板和封堵底板,其中外支撑架内设置有侧边封堵板和封堵底板,侧边封堵板与封堵底板呈直角连接固定,内支撑装置固定在外支撑架内且与侧边封堵板接触固定,在封堵底板上设置有若干振捣孔,可通过圆钢搅拌底部混凝土防止溢出。本发明具有的优点和积极效果是:节约施工工期,大大降低施工成本,保障电梯井、集水井底板位置混凝土的质量,避免后期出现渗漏的风险。
Elevator shaft formwork erecting device and construction method
The invention belongs to the technical field of basement foundation pits, and particularly relates to an elevator shaft formwork erecting device and a construction method. Comprising an outer supporting frame, an inner supporting device, a side edge plugging plate and a plugging bottom plate, the side edge plugging plate and the plugging bottom plate are arranged in the outer supporting frame, the side edge plugging plate and the plugging bottom plate are connected and fixed in a right-angle mode, the inner supporting device is fixed in the outer supporting frame and makes contact with and is fixed to the side edge plugging plate, and a plurality of vibrating holes are formed in the plugging bottom plate. And bottom concrete can be stirred through round steel to prevent overflow. The method has the advantages and positive effects that the construction period is shortened, the construction cost is greatly reduced, the quality of concrete at the bottom plate positions of the elevator shaft and the water-collecting well is guaranteed, and the risk of leakage in the later period is avoided.
本发明属于地下室基坑技术领域,更具体地说,尤其是涉及一种电梯井支模装置及施工方法。包括外支撑架和内支撑装置,侧边封堵板和封堵底板,其中外支撑架内设置有侧边封堵板和封堵底板,侧边封堵板与封堵底板呈直角连接固定,内支撑装置固定在外支撑架内且与侧边封堵板接触固定,在封堵底板上设置有若干振捣孔,可通过圆钢搅拌底部混凝土防止溢出。本发明具有的优点和积极效果是:节约施工工期,大大降低施工成本,保障电梯井、集水井底板位置混凝土的质量,避免后期出现渗漏的风险。
Elevator shaft formwork erecting device and construction method
一种电梯井支模装置及施工方法
WU GUOZHENG (author) / REN XINGXING (author) / WANG JINFENG (author)
2024-02-23
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|European Patent Office | 2021
|Elevator shaft formwork erecting device and anti-falling method
European Patent Office | 2021
|Working platform for erecting of elevator shaft formwork
European Patent Office | 2020
|