A platform for research: civil engineering, architecture and urbanism
Construction method for T-shaped ground wall lining wall joint
According to the T-shaped ground wall lining wall joint construction method, after the lining wall is formed through pouring, the lining wall is connected with the middle partition wall and the underground diaphragm wall into a whole, the overlapping area of the lining wall and the underground diaphragm wall and the overlapping area of the lining wall and the middle partition wall are increased, and the connecting positions of the lining wall and the underground diaphragm wall and the connecting positions of the lining wall and the middle partition wall are tighter, more stable and more reliable. And moreover, the overall stress and deformation coordination capability is greatly enhanced, the overlapping surfaces are uneven and mutually engaged, the waterproof path is lengthened, and the water seepage difficulty is increased. Therefore, construction is convenient, the structure is stable, reliability is high, and quality is good.
本发明提供了一种T型地墙内衬墙接缝施工方法,通过在内衬墙浇筑成型后,与中隔墙和地下连续墙连为一体,使内衬墙与地下连续墙和中隔墙的叠合面积增大,使内衬墙与地下连续墙和中隔墙的连接处更加紧密、稳定、可靠。并且整体受力和变形协调能力大大增强,叠合面凹凸不平互相咬合,防水路径加长,渗水难度加大。因此,本发明方便施工、结构稳定、可靠性高、质量较好。
Construction method for T-shaped ground wall lining wall joint
According to the T-shaped ground wall lining wall joint construction method, after the lining wall is formed through pouring, the lining wall is connected with the middle partition wall and the underground diaphragm wall into a whole, the overlapping area of the lining wall and the underground diaphragm wall and the overlapping area of the lining wall and the middle partition wall are increased, and the connecting positions of the lining wall and the underground diaphragm wall and the connecting positions of the lining wall and the middle partition wall are tighter, more stable and more reliable. And moreover, the overall stress and deformation coordination capability is greatly enhanced, the overlapping surfaces are uneven and mutually engaged, the waterproof path is lengthened, and the water seepage difficulty is increased. Therefore, construction is convenient, the structure is stable, reliability is high, and quality is good.
本发明提供了一种T型地墙内衬墙接缝施工方法,通过在内衬墙浇筑成型后,与中隔墙和地下连续墙连为一体,使内衬墙与地下连续墙和中隔墙的叠合面积增大,使内衬墙与地下连续墙和中隔墙的连接处更加紧密、稳定、可靠。并且整体受力和变形协调能力大大增强,叠合面凹凸不平互相咬合,防水路径加长,渗水难度加大。因此,本发明方便施工、结构稳定、可靠性高、质量较好。
Construction method for T-shaped ground wall lining wall joint
T型地墙内衬墙接缝施工方法
XU QUANWEI (author) / MEI YINGBAO (author) / XIE XIAOLIN (author) / ZHAI JIEQUN (author) / CHEN ZHUCHEN (author) / ZHU PENGTAO (author) / FAN TIANYU (author) / LI YANDI (author) / JIA JIAN (author) / YANG KE (author)
2024-02-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Synchronous construction method for underground diaphragm wall lining wall and structural outer wall
European Patent Office | 2023
|Lining wall construction formwork system and construction method thereof
European Patent Office | 2024
|Basement border area reverse construction method lining wall construction method
European Patent Office | 2021
|