Round pool construction method
The invention belongs to the technical field of building construction, and particularly relates to a circular pool construction method which comprises the steps that firstly, the size of a circular pool to be constructed is determined, the construction position is determined, and construction materials are prepared; step 2, dividing the circular pool to be constructed into at least four bins, and classifying the mutually spaced bins into the same work area; thirdly, the work of erecting a support, installing reinforcing steel bars and installing a formwork is synchronously conducted in the same work area, and then concrete is poured into the formwork; fourthly, after the concrete constructed in the third step is solidified, the third step is repeated to construct other work areas; and fifthly, after the concrete is solidified, the formwork and the support are removed. According to the construction method, construction is conducted in a jumping mode, construction is not conducted between every two adjacent bin positions, the bin positions which are spaced from each other are firstly constructed, and then the adjacent bin positions are constructed after concrete which is poured firstly is solidified, so that temperature cracks and shrinkage cracks generated by concrete pouring of the water pool can be reduced through the construction method.
本申请属于建筑施工技术领域,尤其涉及一种圆形水池施工方法,包括步骤一、确定待施工的圆形水池的尺寸,确定施工位置,准备施工材料;步骤二、将待施工的圆形水池划分为至少四个仓位,将相互间隔开的各个仓位归为同一工区;步骤三、在同一工区同步进行搭设支架、安装钢筋以及安装模板的工作,然后在模板中浇筑混凝土;步骤四、待步骤三施工的混凝土凝固后,重复上述步骤三以施工其他工区;步骤五、待混凝土凝固后拆除模板以及支架。该施工方法采用了跳跃的方式进行施工,相邻两个仓位之间不进行施工,而是先施工相互间隔开的仓位,待先浇筑的混凝土凝固好之后,再施工相邻的仓位,这种施工方法够减少水池因混凝土浇筑产生的温度裂缝和收缩裂缝。
Round pool construction method
The invention belongs to the technical field of building construction, and particularly relates to a circular pool construction method which comprises the steps that firstly, the size of a circular pool to be constructed is determined, the construction position is determined, and construction materials are prepared; step 2, dividing the circular pool to be constructed into at least four bins, and classifying the mutually spaced bins into the same work area; thirdly, the work of erecting a support, installing reinforcing steel bars and installing a formwork is synchronously conducted in the same work area, and then concrete is poured into the formwork; fourthly, after the concrete constructed in the third step is solidified, the third step is repeated to construct other work areas; and fifthly, after the concrete is solidified, the formwork and the support are removed. According to the construction method, construction is conducted in a jumping mode, construction is not conducted between every two adjacent bin positions, the bin positions which are spaced from each other are firstly constructed, and then the adjacent bin positions are constructed after concrete which is poured firstly is solidified, so that temperature cracks and shrinkage cracks generated by concrete pouring of the water pool can be reduced through the construction method.
本申请属于建筑施工技术领域,尤其涉及一种圆形水池施工方法,包括步骤一、确定待施工的圆形水池的尺寸,确定施工位置,准备施工材料;步骤二、将待施工的圆形水池划分为至少四个仓位,将相互间隔开的各个仓位归为同一工区;步骤三、在同一工区同步进行搭设支架、安装钢筋以及安装模板的工作,然后在模板中浇筑混凝土;步骤四、待步骤三施工的混凝土凝固后,重复上述步骤三以施工其他工区;步骤五、待混凝土凝固后拆除模板以及支架。该施工方法采用了跳跃的方式进行施工,相邻两个仓位之间不进行施工,而是先施工相互间隔开的仓位,待先浇筑的混凝土凝固好之后,再施工相邻的仓位,这种施工方法够减少水池因混凝土浇筑产生的温度裂缝和收缩裂缝。
Round pool construction method
一种圆形水池施工方法
LI WENJIE (author) / XU RUOHAN (author) / WANG JIANTAO (author) / ZHOU YAO (author) / ZHOU SIDAI (author) / LAN MENGYAO (author) / LIU YANG (author) / QIANG JUNBO (author)
2024-02-27
Patent
Electronic Resource
Chinese