A platform for research: civil engineering, architecture and urbanism
Movable wall concrete pouring steel formwork combined structure and pouring method
The invention discloses a movable wall concrete pouring steel formwork combined structure. The movable wall concrete pouring steel formwork combined structure comprises a fixed formwork, a movable formwork and a guide rail. The movable template comprises a vertical template and a horizontal plate which are fixedly connected with each other; the pouring surfaces of the movable template and the fixed template are opposite, a roller frame is arranged on the side surface, back to the pouring surface, of the movable template, a first roller in rolling fit with the guide rail is mounted on the roller frame, and the first roller is movably connected with the roller frame; a plurality of grooves are formed in the bottom surface of a horizontal plate of the movable template, and second rollers are connected in the grooves in a rolling manner; when concrete is poured, the horizontal plate of the movable formwork is fixed to a concrete foundation through the detachable fixing piece. Concrete is poured between the movable formwork and the fixed formwork; after concrete pouring is completed, the horizontal plate of the movable formwork is separated from the detachable fixing piece, the first rolling wheel is connected with the guide rail in a rolling fit mode, and the movable formwork moves along the guide rail under the action of external force. According to the construction method, efficient, rapid and convenient construction is carried out by combining the construction characteristics of wall bodies such as the slab culvert.
本发明公开了一种可移动式墙身混凝土浇筑钢模板组合结构,包括固定模板、移动模板及导轨;移动模板包括相互固接的立模板和水平板;移动模板与固定模板两者的浇筑面相对,移动模板背对浇筑面的侧面设有滚轮架,滚轮架上安装有与导轨滚动配合的第一滚轮,第一滚轮与滚轮架活动连接;移动模板的水平板底面设有若干凹槽,凹槽内滚动连接有第二滚轮;混凝土浇筑时,移动模板的水平板通过可拆卸固定件固定在混凝土基础上;在移动模板和固定模板之间浇筑混凝土;混凝土浇筑完毕后,移动模板的水平板与可拆卸固定件拆分,第一滚轮与导轨滚动配合连接,在外力作用下,移动模板沿导轨移动。本发明结合盖板涵等墙身的施工特点进行高效、快速、便捷的施工。
Movable wall concrete pouring steel formwork combined structure and pouring method
The invention discloses a movable wall concrete pouring steel formwork combined structure. The movable wall concrete pouring steel formwork combined structure comprises a fixed formwork, a movable formwork and a guide rail. The movable template comprises a vertical template and a horizontal plate which are fixedly connected with each other; the pouring surfaces of the movable template and the fixed template are opposite, a roller frame is arranged on the side surface, back to the pouring surface, of the movable template, a first roller in rolling fit with the guide rail is mounted on the roller frame, and the first roller is movably connected with the roller frame; a plurality of grooves are formed in the bottom surface of a horizontal plate of the movable template, and second rollers are connected in the grooves in a rolling manner; when concrete is poured, the horizontal plate of the movable formwork is fixed to a concrete foundation through the detachable fixing piece. Concrete is poured between the movable formwork and the fixed formwork; after concrete pouring is completed, the horizontal plate of the movable formwork is separated from the detachable fixing piece, the first rolling wheel is connected with the guide rail in a rolling fit mode, and the movable formwork moves along the guide rail under the action of external force. According to the construction method, efficient, rapid and convenient construction is carried out by combining the construction characteristics of wall bodies such as the slab culvert.
本发明公开了一种可移动式墙身混凝土浇筑钢模板组合结构,包括固定模板、移动模板及导轨;移动模板包括相互固接的立模板和水平板;移动模板与固定模板两者的浇筑面相对,移动模板背对浇筑面的侧面设有滚轮架,滚轮架上安装有与导轨滚动配合的第一滚轮,第一滚轮与滚轮架活动连接;移动模板的水平板底面设有若干凹槽,凹槽内滚动连接有第二滚轮;混凝土浇筑时,移动模板的水平板通过可拆卸固定件固定在混凝土基础上;在移动模板和固定模板之间浇筑混凝土;混凝土浇筑完毕后,移动模板的水平板与可拆卸固定件拆分,第一滚轮与导轨滚动配合连接,在外力作用下,移动模板沿导轨移动。本发明结合盖板涵等墙身的施工特点进行高效、快速、便捷的施工。
Movable wall concrete pouring steel formwork combined structure and pouring method
一种可移动式墙身混凝土浇筑钢模板组合结构及浇筑方法
ZHU JUN (author) / MA JIANXIN (author) / SANG SONGLING (author) / LI XIN (author) / LI ZEFA (author) / HU NING (author)
2024-02-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Formwork structure for concrete pouring and concrete pouring method
European Patent Office | 2021
|Multifunctional pouring formwork and wall pouring equipment
European Patent Office | 2020
|