Construction method for replacing wooden outrigger of rammed earth building
The invention relates to the field of buildings, and discloses a construction method for replacing a wooden outrigger of a rammed earth building. The construction method for replacing the wooden outrigger of the rammed earth building comprises the following steps that loads on the upper portion of the wooden outrigger are unloaded; a plurality of grouting holes are machined in the top end face of the gable along the plane perpendicular to the foundation of the gable, and the bottom end faces of the grouting holes are lower than the lowest point of the horizontal position of the wooden outrigger; grouting materials are injected into the grouting holes; a plurality of separation holes are formed in the side face of the gable wall and right face the wood outrigger, and the separation holes penetrate through the surface of the wood outrigger; the wood outrigger is pulled out of the gable wall and taken out, and a new wood outrigger is inserted; and after the wood outrigger is replaced, the gap between the wood outrigger and the gable wall is blocked, and the repairing requirement and the protection requirement for replacing the wood outrigger of an existing rammed earth building can be met.
本发明涉及建筑领域,公开了一种用于夯土建筑木挑梁更换的施工方法。本发明中所提供的用于夯土建筑木挑梁更换的施工方法,包括如下步骤:卸去木挑梁上部的载荷;自山墙顶部端面沿山墙垂直地基平面加工多个灌浆孔,所述灌浆孔的底部端面低于木挑梁水平位置最低点;对灌浆孔进行灌浆注入灌浆材料;从山墙侧面正对木挑梁加工多个脱离孔,所述脱离孔贯通至木挑梁的表面;将木挑梁从山墙内抽离取出木挑梁,插入新的木挑梁;木挑梁替换后,封堵木挑梁与山墙之间的缝隙,能够满足现有夯土建筑更换木挑梁的修缮需求和保护需求。
Construction method for replacing wooden outrigger of rammed earth building
The invention relates to the field of buildings, and discloses a construction method for replacing a wooden outrigger of a rammed earth building. The construction method for replacing the wooden outrigger of the rammed earth building comprises the following steps that loads on the upper portion of the wooden outrigger are unloaded; a plurality of grouting holes are machined in the top end face of the gable along the plane perpendicular to the foundation of the gable, and the bottom end faces of the grouting holes are lower than the lowest point of the horizontal position of the wooden outrigger; grouting materials are injected into the grouting holes; a plurality of separation holes are formed in the side face of the gable wall and right face the wood outrigger, and the separation holes penetrate through the surface of the wood outrigger; the wood outrigger is pulled out of the gable wall and taken out, and a new wood outrigger is inserted; and after the wood outrigger is replaced, the gap between the wood outrigger and the gable wall is blocked, and the repairing requirement and the protection requirement for replacing the wood outrigger of an existing rammed earth building can be met.
本发明涉及建筑领域,公开了一种用于夯土建筑木挑梁更换的施工方法。本发明中所提供的用于夯土建筑木挑梁更换的施工方法,包括如下步骤:卸去木挑梁上部的载荷;自山墙顶部端面沿山墙垂直地基平面加工多个灌浆孔,所述灌浆孔的底部端面低于木挑梁水平位置最低点;对灌浆孔进行灌浆注入灌浆材料;从山墙侧面正对木挑梁加工多个脱离孔,所述脱离孔贯通至木挑梁的表面;将木挑梁从山墙内抽离取出木挑梁,插入新的木挑梁;木挑梁替换后,封堵木挑梁与山墙之间的缝隙,能够满足现有夯土建筑更换木挑梁的修缮需求和保护需求。
Construction method for replacing wooden outrigger of rammed earth building
一种用于夯土建筑木挑梁更换的施工方法
XU SONGFENG (author) / HUANG KE (author) / WANG XIAODONG (author) / XU QING (author)
2024-02-27
Patent
Electronic Resource
Chinese
Rammed earth building construction
Engineering Index Backfile | 1943
|Building skin rammed earth wall and construction method thereof
European Patent Office | 2023
|Reinforced structure of rammed earth wall, reinforced rammed earth wall and construction method
European Patent Office | 2023
|