Fabricated building construction method
The invention discloses an assembly type building construction method, which relates to the technical field of building construction, and comprises the following steps: step 1, clamping a preassembled wall body by a clamping mechanism; secondly, a position adjusting mechanism adjusts the clamping force of the clamping mechanism in the wall transportation process; thirdly, a transmission mechanism controls a mounting mechanism to arrange mounting blocks on the surface of the preassembled wall in transportation; fourthly, the preassembled wall body with the surface installation blocks installed is placed at a construction point; the position adjusting mechanism adjusts according to the width of the current pre-assembled wall, if the current pre-assembled wall is wide and the pre-assembled wall is clamped by the clamping mechanisms on the left side and the right side, the supporting plate drives the sliding plate to continue to move downwards under the gravity of the pre-assembled wall, and the sliding plate stretches the elastic rod when continuing to move downwards at the moment; and when the elastic rod is stretched, pulling force is applied to the driving hinge plate, and the clamping force applied by the clamping mechanism to the wider preassembled wall body is further improved.
本发明公开了一种装配式建筑施工方法,涉及建筑施工技术领域,包括以下步骤:步骤一:夹持机构对预装墙体进行夹持;步骤二:调位机构在墙体运输过程中调节夹持机构的夹持力;步骤三:传动机构控制安装机构将运输中的预装墙体表面设置安装块;步骤四:将表面安装块安装完成后的预装墙体放置在施工点;调位机构根据当前预装墙体宽度进行调节,若当前预装墙体较宽且左右侧夹持机构已对预装墙体进行夹持,支撑板在预装墙体重力下带动滑动板继续向下运动,滑动板此时继续向下运动时对弹性杆进行拉伸,弹性杆拉伸的同时对驱动铰接板施加拉力,进一步提高夹持机构对更宽的预装墙体施加更大的夹持力。
Fabricated building construction method
The invention discloses an assembly type building construction method, which relates to the technical field of building construction, and comprises the following steps: step 1, clamping a preassembled wall body by a clamping mechanism; secondly, a position adjusting mechanism adjusts the clamping force of the clamping mechanism in the wall transportation process; thirdly, a transmission mechanism controls a mounting mechanism to arrange mounting blocks on the surface of the preassembled wall in transportation; fourthly, the preassembled wall body with the surface installation blocks installed is placed at a construction point; the position adjusting mechanism adjusts according to the width of the current pre-assembled wall, if the current pre-assembled wall is wide and the pre-assembled wall is clamped by the clamping mechanisms on the left side and the right side, the supporting plate drives the sliding plate to continue to move downwards under the gravity of the pre-assembled wall, and the sliding plate stretches the elastic rod when continuing to move downwards at the moment; and when the elastic rod is stretched, pulling force is applied to the driving hinge plate, and the clamping force applied by the clamping mechanism to the wider preassembled wall body is further improved.
本发明公开了一种装配式建筑施工方法,涉及建筑施工技术领域,包括以下步骤:步骤一:夹持机构对预装墙体进行夹持;步骤二:调位机构在墙体运输过程中调节夹持机构的夹持力;步骤三:传动机构控制安装机构将运输中的预装墙体表面设置安装块;步骤四:将表面安装块安装完成后的预装墙体放置在施工点;调位机构根据当前预装墙体宽度进行调节,若当前预装墙体较宽且左右侧夹持机构已对预装墙体进行夹持,支撑板在预装墙体重力下带动滑动板继续向下运动,滑动板此时继续向下运动时对弹性杆进行拉伸,弹性杆拉伸的同时对驱动铰接板施加拉力,进一步提高夹持机构对更宽的预装墙体施加更大的夹持力。
Fabricated building construction method
装配式建筑施工方法
ZHANG GUILIN (author) / DONG CHANGHONG (author) / LI YANG (author) / YAN HONGDUO (author) / SUN XUN (author)
2024-03-01
Patent
Electronic Resource
Chinese
Fabricated building and fabricated building construction method
European Patent Office | 2023
|Fabricated building and fabricated building construction method
European Patent Office | 2024
|Fabricated building component, fabricated building and construction method
European Patent Office | 2023
|