A platform for research: civil engineering, architecture and urbanism
Erecting method and erecting component of bridge jacking platform
The invention relates to the technical field of bridge transformation, and discloses an erecting method and erecting component of a bridge jacking platform, and the erecting component comprises a reinforcing rib arranged on a pier column, a reinforcing ring arranged on the peripheral side of the pier column, a positioning steel ring arranged on the outer side of the reinforcing ring and a positioning hoop arranged on the outer side of the reinforcing ring; the end face of the lower end of the positioning hoop abuts against the end face of the upper end of the positioning steel ring, and the end, away from the pier column, of the reinforcing rib is fixed to the reinforcing ring. The bracket is arranged on the side wall of the outer side of the positioning hoop, the distribution beam is arranged on the bracket and used for containing a jack, the operation platform is arranged on the positioning steel ring, the bracket is symmetrically arranged at the side wall end of the outer side of the positioning hoop, and damage to a bridge structure can be reduced when the jacking platform is built.
本申请涉及桥梁改造的技术领域,公开了一种桥梁顶升平台的搭设方法及搭设构件,其包括设置于墩柱上的加强筋、设置于墩柱周侧的加强环、设置于加强环外侧的定位钢圈和设置于所述加强环外侧的定位抱箍,所述定位抱箍下端端面抵接于所述定位钢圈上端端面,所述加强筋远离墩柱的一端与所述加强环相固定;还包括设置于所述定位抱箍外侧侧壁上的牛腿,设置于所述牛腿上用于放置千斤顶的分配梁,以及设置于所述定位钢圈上的操作平台,所述牛腿于所述定位抱箍外侧侧壁端对称设置,本申请能够在搭建顶升平台时减少对桥梁结构的破坏。
Erecting method and erecting component of bridge jacking platform
The invention relates to the technical field of bridge transformation, and discloses an erecting method and erecting component of a bridge jacking platform, and the erecting component comprises a reinforcing rib arranged on a pier column, a reinforcing ring arranged on the peripheral side of the pier column, a positioning steel ring arranged on the outer side of the reinforcing ring and a positioning hoop arranged on the outer side of the reinforcing ring; the end face of the lower end of the positioning hoop abuts against the end face of the upper end of the positioning steel ring, and the end, away from the pier column, of the reinforcing rib is fixed to the reinforcing ring. The bracket is arranged on the side wall of the outer side of the positioning hoop, the distribution beam is arranged on the bracket and used for containing a jack, the operation platform is arranged on the positioning steel ring, the bracket is symmetrically arranged at the side wall end of the outer side of the positioning hoop, and damage to a bridge structure can be reduced when the jacking platform is built.
本申请涉及桥梁改造的技术领域,公开了一种桥梁顶升平台的搭设方法及搭设构件,其包括设置于墩柱上的加强筋、设置于墩柱周侧的加强环、设置于加强环外侧的定位钢圈和设置于所述加强环外侧的定位抱箍,所述定位抱箍下端端面抵接于所述定位钢圈上端端面,所述加强筋远离墩柱的一端与所述加强环相固定;还包括设置于所述定位抱箍外侧侧壁上的牛腿,设置于所述牛腿上用于放置千斤顶的分配梁,以及设置于所述定位钢圈上的操作平台,所述牛腿于所述定位抱箍外侧侧壁端对称设置,本申请能够在搭建顶升平台时减少对桥梁结构的破坏。
Erecting method and erecting component of bridge jacking platform
一种桥梁顶升平台的搭设方法及搭设构件
WU RIHUI (author) / LIN YUHUI (author) / ZHENG DEBIN (author) / LIN MIAO (author) / LIN GUANGZHEN (author) / CHEN YE (author) / WU QINGHUA (author) / LIU YOUMING (author)
2024-03-05
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Erecting mechanism, erecting device and bridge erecting vehicle
European Patent Office | 2021
|Bridge erecting method and bridge erecting machine for realizing the bridge erecting method
European Patent Office | 2020
|Multifunctional bridge erecting machine and bridge erecting construction method
European Patent Office | 2022
|