A platform for research: civil engineering, architecture and urbanism
Road guardrail assembling structure and operation method
The invention discloses a road guardrail assembly structure and an operation method, and relates to the field of road guardrails. A road guardrail assembling structure comprises a plurality of supporting guardrails, the tops and the bottoms of the corresponding sides of the supporting guardrails are fixedly connected with fixing bases, grooves are formed in the tops of the fixing bases, frames are fixedly connected to the bottoms of inner cavities of the grooves, the front sides and the rear sides of the bottoms of inner cavities of the frames are fixedly connected with fixing columns, and the fixing columns are fixedly connected with the supporting guardrails. The top of the fixing column is fixedly connected with a supporting plate, and the top of the supporting plate is provided with a locking block. According to the road guardrail assembling structure and the operation method, during assembling, the vertical beams are inserted into the through grooves in the upper portions of the cross beams, then the first supporting beams and the second supporting beams are inserted into the fixing bases, and the locking blocks on the first supporting beams and the locking blocks on the second supporting beams are located on the supporting plates at the moment; and then the upper part and the lower part of the cross beam are inserted into the first positioning groove and the second positioning groove, and the two ends of the cross beam are inserted into the fixing grooves.
本发明公开了一种道路护栏组装结构及操作方法,涉及道路护栏领域。一种道路护栏组装结构,包括多个支撑护栏,所述支撑护栏相对应一侧的顶部和底部均固定连接有固定座,所述固定座的顶部开设有凹槽,所述凹槽内腔的底部固定连接有框架,所述框架内腔底部的前侧和后侧均固定连接有固定柱,所述固定柱的顶部固定连接有支撑板,所述支撑板的顶部设置有锁紧块。本发明提供一种道路护栏组装结构及操作方法,装配时,首先将竖梁插入横梁上方的通槽中,然后将第一支撑梁和第二支撑梁插入固定座内,此时第一支撑梁与第二支撑梁上的锁紧块位于支撑板上,然后将横梁的上方与下方插入第一定位槽和第二定位槽中,并使横梁两端插入固定槽中。
Road guardrail assembling structure and operation method
The invention discloses a road guardrail assembly structure and an operation method, and relates to the field of road guardrails. A road guardrail assembling structure comprises a plurality of supporting guardrails, the tops and the bottoms of the corresponding sides of the supporting guardrails are fixedly connected with fixing bases, grooves are formed in the tops of the fixing bases, frames are fixedly connected to the bottoms of inner cavities of the grooves, the front sides and the rear sides of the bottoms of inner cavities of the frames are fixedly connected with fixing columns, and the fixing columns are fixedly connected with the supporting guardrails. The top of the fixing column is fixedly connected with a supporting plate, and the top of the supporting plate is provided with a locking block. According to the road guardrail assembling structure and the operation method, during assembling, the vertical beams are inserted into the through grooves in the upper portions of the cross beams, then the first supporting beams and the second supporting beams are inserted into the fixing bases, and the locking blocks on the first supporting beams and the locking blocks on the second supporting beams are located on the supporting plates at the moment; and then the upper part and the lower part of the cross beam are inserted into the first positioning groove and the second positioning groove, and the two ends of the cross beam are inserted into the fixing grooves.
本发明公开了一种道路护栏组装结构及操作方法,涉及道路护栏领域。一种道路护栏组装结构,包括多个支撑护栏,所述支撑护栏相对应一侧的顶部和底部均固定连接有固定座,所述固定座的顶部开设有凹槽,所述凹槽内腔的底部固定连接有框架,所述框架内腔底部的前侧和后侧均固定连接有固定柱,所述固定柱的顶部固定连接有支撑板,所述支撑板的顶部设置有锁紧块。本发明提供一种道路护栏组装结构及操作方法,装配时,首先将竖梁插入横梁上方的通槽中,然后将第一支撑梁和第二支撑梁插入固定座内,此时第一支撑梁与第二支撑梁上的锁紧块位于支撑板上,然后将横梁的上方与下方插入第一定位槽和第二定位槽中,并使横梁两端插入固定槽中。
Road guardrail assembling structure and operation method
一种道路护栏组装结构及操作方法
WANG MINGXIANG (author)
2024-03-08
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Assembling type guardrail for construction site and assembling method of assembling type guardrail
European Patent Office | 2023
|European Patent Office | 2021
|