Method for installing pile plug of closed pipe pile core
The invention relates to the technical field of tubular piles, and discloses a pile plug mounting method for sealing a tubular pile core, which comprises the following mounting steps: 1) embedding a tubular pile into a soil body, the tubular pile is internally provided with the pile core, and the upper part of the pile core is provided with a mounting position; two wedges are placed in the mounting position of the pile core; (2) a plug plate is placed in the mounting position of the pile core, the inner sides of the two wedges are embedded in the plug plate, the outer sides of the wedges abut against the inner side wall of the pile core, and the periphery of the plug plate abuts against the inner side wall of the pile core; and (3) the two wedges are driven to move upwards, the plug plate is driven to move downwards till the plug plate and the two wedges are relatively fixed in the pile core, and the pile core is closed. Thus, after the pipe pile is fed into the set depth through the pile feeder subsequently, the plug plate and the two wedges are relatively fixed in the pile core, the installation position is plugged, and the situation that the pile core is filled with soil or cement paste, and consequently a reinforcement cage and core filling concrete cannot be constructed in the later period is avoided.
本发明涉及管桩的技术领域,公开了封闭管桩桩芯的桩塞安装方法,包括以下安装步骤:1)、管桩嵌入在土体中,管桩的内部具有桩芯,桩芯的上部具有安装位置;在桩芯的安装位置放入两个楔子;2)、在桩芯的安装位置放入塞板,两个楔子的内侧嵌入在塞板中,楔子的外侧抵接着桩芯的内侧壁,塞板的外周抵接着桩芯的内侧壁;3)、驱动两个楔子朝上移动,驱动塞板朝下移动,直至塞板与两个楔子相对固定在桩芯中,且将桩芯封闭。这样,后续通过送桩器将管桩送入设定深度以后,通过塞板与两个楔子相对固定在桩芯中,将安装位置处封堵住,避免桩芯被泥土或水泥浆填塞,导致后期钢筋笼及填芯混凝土无法施工。
Method for installing pile plug of closed pipe pile core
The invention relates to the technical field of tubular piles, and discloses a pile plug mounting method for sealing a tubular pile core, which comprises the following mounting steps: 1) embedding a tubular pile into a soil body, the tubular pile is internally provided with the pile core, and the upper part of the pile core is provided with a mounting position; two wedges are placed in the mounting position of the pile core; (2) a plug plate is placed in the mounting position of the pile core, the inner sides of the two wedges are embedded in the plug plate, the outer sides of the wedges abut against the inner side wall of the pile core, and the periphery of the plug plate abuts against the inner side wall of the pile core; and (3) the two wedges are driven to move upwards, the plug plate is driven to move downwards till the plug plate and the two wedges are relatively fixed in the pile core, and the pile core is closed. Thus, after the pipe pile is fed into the set depth through the pile feeder subsequently, the plug plate and the two wedges are relatively fixed in the pile core, the installation position is plugged, and the situation that the pile core is filled with soil or cement paste, and consequently a reinforcement cage and core filling concrete cannot be constructed in the later period is avoided.
本发明涉及管桩的技术领域,公开了封闭管桩桩芯的桩塞安装方法,包括以下安装步骤:1)、管桩嵌入在土体中,管桩的内部具有桩芯,桩芯的上部具有安装位置;在桩芯的安装位置放入两个楔子;2)、在桩芯的安装位置放入塞板,两个楔子的内侧嵌入在塞板中,楔子的外侧抵接着桩芯的内侧壁,塞板的外周抵接着桩芯的内侧壁;3)、驱动两个楔子朝上移动,驱动塞板朝下移动,直至塞板与两个楔子相对固定在桩芯中,且将桩芯封闭。这样,后续通过送桩器将管桩送入设定深度以后,通过塞板与两个楔子相对固定在桩芯中,将安装位置处封堵住,避免桩芯被泥土或水泥浆填塞,导致后期钢筋笼及填芯混凝土无法施工。
Method for installing pile plug of closed pipe pile core
封闭管桩桩芯的桩塞安装方法
FANG JIANGFENG (author) / JIN CHENG (author) / ZHANG SIQI (author) / LIAO HUANYU (author) / LI JING (author) / WANG CHUANLONG (author) / ZHAO XINBO (author)
2024-03-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE PILE AND METHOD FOR INSTALLING STEEL PIPE PILE
European Patent Office | 2020
|STEEL PIPE PILE DEVICE, STEEL PIPE PILE AND METHOD FOR INSTALLING STEEL PIPE PILE
European Patent Office | 2018
|STEEL PIPE PILE AND METHOD FOR INSTALLING STEEL PIPE PILE
European Patent Office | 2020
|