A platform for research: civil engineering, architecture and urbanism
Steel sheet pile cofferdam existing diagonal bracing in-situ repairing device and construction method thereof
The invention relates to a steel sheet pile cofferdam existing diagonal brace in-situ repairing device and a construction method thereof.The steel sheet pile cofferdam existing diagonal brace in-situ repairing device comprises a first steel casing and a second steel casing, and the first steel casing and the second steel casing are both arranged on a first diagonal brace used in cooperation with the repairing device in a sleeving mode; the first diagonal brace comprises a first section and a second section which are separated from each other after a damaged section is cut off, the ends, away from each other, of the first section and the second section are used for being connected to the inner wall of the steel sheet pile cofferdam, the first steel casing is fixedly arranged on the first section, the second steel casing is fixedly arranged on the second section, and the first steel casing and the second steel casing are fixedly connected to the first section. The ends, close to each other, of the first steel casing and the second steel casing are fixedly connected. The method has the effects that the diagonal bracings of the steel sheet pile cofferdam are rapidly repaired, and the influence on the construction progress is reduced.
本申请涉及一种钢板桩围堰既有对撑原位修复装置及其施工方法,其包括第一钢护筒和第二钢护筒,所述第一钢护筒和所述第二钢护筒均套设于用于配合所述修复装置使用的第一对撑上,所述第一对撑包括切除损坏节段后相互分离的第一节段和第二节段,所述第一节段和所述第二节段相互远离的一端分别用于连接于钢板桩围堰内壁,所述第一钢护筒固设于所述第一节段,所述第二钢护筒固设于所述第二节段,所述第一钢护筒和所述第二钢护筒相互靠近的一端固定连接。本申请具有快速修复钢板桩围堰的对撑,减少对施工进度影响的效果。
Steel sheet pile cofferdam existing diagonal bracing in-situ repairing device and construction method thereof
The invention relates to a steel sheet pile cofferdam existing diagonal brace in-situ repairing device and a construction method thereof.The steel sheet pile cofferdam existing diagonal brace in-situ repairing device comprises a first steel casing and a second steel casing, and the first steel casing and the second steel casing are both arranged on a first diagonal brace used in cooperation with the repairing device in a sleeving mode; the first diagonal brace comprises a first section and a second section which are separated from each other after a damaged section is cut off, the ends, away from each other, of the first section and the second section are used for being connected to the inner wall of the steel sheet pile cofferdam, the first steel casing is fixedly arranged on the first section, the second steel casing is fixedly arranged on the second section, and the first steel casing and the second steel casing are fixedly connected to the first section. The ends, close to each other, of the first steel casing and the second steel casing are fixedly connected. The method has the effects that the diagonal bracings of the steel sheet pile cofferdam are rapidly repaired, and the influence on the construction progress is reduced.
本申请涉及一种钢板桩围堰既有对撑原位修复装置及其施工方法,其包括第一钢护筒和第二钢护筒,所述第一钢护筒和所述第二钢护筒均套设于用于配合所述修复装置使用的第一对撑上,所述第一对撑包括切除损坏节段后相互分离的第一节段和第二节段,所述第一节段和所述第二节段相互远离的一端分别用于连接于钢板桩围堰内壁,所述第一钢护筒固设于所述第一节段,所述第二钢护筒固设于所述第二节段,所述第一钢护筒和所述第二钢护筒相互靠近的一端固定连接。本申请具有快速修复钢板桩围堰的对撑,减少对施工进度影响的效果。
Steel sheet pile cofferdam existing diagonal bracing in-situ repairing device and construction method thereof
一种钢板桩围堰既有对撑原位修复装置及其施工方法
LI YONG (author) / CHENG CHAOLONG (author) / YAN CHUANCHUAN (author) / XIAO RUI (author) / RONG MIN (author) / ZHANG PING (author) / JIANG XIN (author) / LI XIAOCHUAN (author) / LI QICONG (author) / XU LIANG (author)
2024-03-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel sheet pile cofferdam and construction method thereof
European Patent Office | 2024
|Steel sheet pile cofferdam and construction method thereof
European Patent Office | 2020
|