Fixing method for special-shaped structure of outer climbing frame
The invention discloses a method for fixing a special-shaped structure of an external climbing frame, which comprises a beam-plate-free atrium climbing frame treatment mode: a conventional climbing frame needs to be effectively attached to a main body structure on each floor, and a part of floors meet the use function requirements, are in a high formwork area and exceed the attachment requirements of the external climbing frame; a steel plate and a floor penetrating sleeve need to be pre-embedded in the position in advance, a climbing frame attachment steel column is connected with the structure, and the effect of fixing the climbing frame is achieved. According to the method, the climbing frame is fixed by attaching the steel columns to the floor-free portion, the two-layer bailey truss ladder-shaped overhanging mode is innovatively adopted at the overhanging portion, loads are reasonably distributed, and the safety of climbing frame installation is guaranteed.
本发明公开了一种外爬架异形结构处固定方法,包括无梁板中庭部位爬架处理方式:常规爬架需要在每一楼层与主体结构进行有效附着,部分楼层为满足使用功能要求,为高支模区域,超过外爬架的附着要求,该部位需要通过提前预埋钢板和穿楼板套管,将爬架附着钢柱与结构连接,达到固定爬架的作用。本发明通过在无楼板部位通过附着钢柱,对爬架进行固定,在悬挑部位,创新采用两层贝雷架阶梯型悬挑的形式,荷载合理分布,保证爬架安装的安全。
Fixing method for special-shaped structure of outer climbing frame
The invention discloses a method for fixing a special-shaped structure of an external climbing frame, which comprises a beam-plate-free atrium climbing frame treatment mode: a conventional climbing frame needs to be effectively attached to a main body structure on each floor, and a part of floors meet the use function requirements, are in a high formwork area and exceed the attachment requirements of the external climbing frame; a steel plate and a floor penetrating sleeve need to be pre-embedded in the position in advance, a climbing frame attachment steel column is connected with the structure, and the effect of fixing the climbing frame is achieved. According to the method, the climbing frame is fixed by attaching the steel columns to the floor-free portion, the two-layer bailey truss ladder-shaped overhanging mode is innovatively adopted at the overhanging portion, loads are reasonably distributed, and the safety of climbing frame installation is guaranteed.
本发明公开了一种外爬架异形结构处固定方法,包括无梁板中庭部位爬架处理方式:常规爬架需要在每一楼层与主体结构进行有效附着,部分楼层为满足使用功能要求,为高支模区域,超过外爬架的附着要求,该部位需要通过提前预埋钢板和穿楼板套管,将爬架附着钢柱与结构连接,达到固定爬架的作用。本发明通过在无楼板部位通过附着钢柱,对爬架进行固定,在悬挑部位,创新采用两层贝雷架阶梯型悬挑的形式,荷载合理分布,保证爬架安装的安全。
Fixing method for special-shaped structure of outer climbing frame
一种外爬架异形结构处固定方法
SUN PENGCHENG (author) / ZHANG GUANGXING (author) / DING DANGSHENG (author) / SU MINGSHEN (author) / ZHENG CHANGWANG (author) / TAO WEIQI (author)
2024-03-08
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Climbing frame fixing structure and building construction climbing frame
European Patent Office | 2023
|