A platform for research: civil engineering, architecture and urbanism
The invention relates to a corridor special for urban aerial bicycles. The corridor comprises a plurality of supporting columns arranged on the ground in the design direction. The traveling track is erected on the supporting column, and the width of the traveling track is matched with that of a wheel of a bicycle; the pre-tensioning cables are connected between every two adjacent supporting columns in a tensioning mode, and the pre-tensioning cables are arranged below the traveling crane rail; and the connecting piece is supported and connected between the crane rail and the pre-tensioning cable. An air corridor is provided for a bicycle, the driving track is fixed through the pre-tensioning cable and the supporting columns, the supporting columns can be helped to share the pressure of the driving track through the pre-tensioning cable, the span of the driving track can be increased, in this way, the number of the supporting columns can be reduced, and occupation and influence on the ground are reduced.
本发明涉及一种城市空中自行车专用走廊,包括:沿设计方向布设于地面上的多个支撑柱;架设于支撑柱上的行车轨道,宽度适配于自行车的车轮的宽度;张拉连接于相邻的两个支撑柱之间的预张紧索,设于行车轨道的下方;支撑连接于行车轨道和预张紧索之间的连接件。本发明为自行车提供一个空中走廊,利用预张紧索和支撑柱来固定行车轨道,预张紧索的设置能够帮助支撑柱分担行车轨道的压力,使得行车轨道的跨度能够加大,如此可减少支撑柱的设置数量,减少了对地面的占用和影响。
The invention relates to a corridor special for urban aerial bicycles. The corridor comprises a plurality of supporting columns arranged on the ground in the design direction. The traveling track is erected on the supporting column, and the width of the traveling track is matched with that of a wheel of a bicycle; the pre-tensioning cables are connected between every two adjacent supporting columns in a tensioning mode, and the pre-tensioning cables are arranged below the traveling crane rail; and the connecting piece is supported and connected between the crane rail and the pre-tensioning cable. An air corridor is provided for a bicycle, the driving track is fixed through the pre-tensioning cable and the supporting columns, the supporting columns can be helped to share the pressure of the driving track through the pre-tensioning cable, the span of the driving track can be increased, in this way, the number of the supporting columns can be reduced, and occupation and influence on the ground are reduced.
本发明涉及一种城市空中自行车专用走廊,包括:沿设计方向布设于地面上的多个支撑柱;架设于支撑柱上的行车轨道,宽度适配于自行车的车轮的宽度;张拉连接于相邻的两个支撑柱之间的预张紧索,设于行车轨道的下方;支撑连接于行车轨道和预张紧索之间的连接件。本发明为自行车提供一个空中走廊,利用预张紧索和支撑柱来固定行车轨道,预张紧索的设置能够帮助支撑柱分担行车轨道的压力,使得行车轨道的跨度能够加大,如此可减少支撑柱的设置数量,减少了对地面的占用和影响。
Corridor special for urban aerial bicycles
城市空中自行车专用走廊
LI WUJIERUI (author)
2024-03-15
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE