A platform for research: civil engineering, architecture and urbanism
River flood control and flood water resource utilization system and construction method thereof
The invention relates to a river flood control and flood water resource utilization system and a construction method thereof. The method is suitable for the field of hydraulic engineering. The technical problem to be solved by the invention is to provide the river flood control and flood water resource utilization system and the construction method thereof. According to the technical scheme, the river flood control and flood water resource utilization system comprises a drainage open channel and a seepage well; wherein the drainage open channels are distributed on the urban river channel at certain intervals, and the bottoms of the drainage open channels are higher than the normal water level of the river channel; the tail end of the drainage open channel is connected with the seepage well; the seepage well is deeper than the permeable stratum; the bottom of the seepage well is provided with a plurality of seepage holes along the periphery of the well wall in a permeable stratum; the water seepage holes are protected by steel bar grids; a plurality of energy dissipation side plates are arranged on the side wall of the seepage well.
本发明涉及一种河道防洪及洪水水资源利用系统及其施工方法。本发明适用于水利工程领域。本发明要解决的技术问题是:提供一种河道防洪及洪水水资源利用系统及其施工方法。本发明所采用的技术方案是:一种河道防洪及洪水水资源利用系统,包括:引流明渠和渗水井;其中,所述引流明渠按一定间距分布在城市河道上,所述引流明渠的底部高于河道常水位;所述引流明渠的末端连接所述渗水井;所述渗水井的深度大于透水地层;所述渗水井底部在透水地层沿着井壁一周设置若干渗水孔;所述渗水孔采用钢筋格栅防护;所述渗水井侧壁设置若干消能侧板。
River flood control and flood water resource utilization system and construction method thereof
The invention relates to a river flood control and flood water resource utilization system and a construction method thereof. The method is suitable for the field of hydraulic engineering. The technical problem to be solved by the invention is to provide the river flood control and flood water resource utilization system and the construction method thereof. According to the technical scheme, the river flood control and flood water resource utilization system comprises a drainage open channel and a seepage well; wherein the drainage open channels are distributed on the urban river channel at certain intervals, and the bottoms of the drainage open channels are higher than the normal water level of the river channel; the tail end of the drainage open channel is connected with the seepage well; the seepage well is deeper than the permeable stratum; the bottom of the seepage well is provided with a plurality of seepage holes along the periphery of the well wall in a permeable stratum; the water seepage holes are protected by steel bar grids; a plurality of energy dissipation side plates are arranged on the side wall of the seepage well.
本发明涉及一种河道防洪及洪水水资源利用系统及其施工方法。本发明适用于水利工程领域。本发明要解决的技术问题是:提供一种河道防洪及洪水水资源利用系统及其施工方法。本发明所采用的技术方案是:一种河道防洪及洪水水资源利用系统,包括:引流明渠和渗水井;其中,所述引流明渠按一定间距分布在城市河道上,所述引流明渠的底部高于河道常水位;所述引流明渠的末端连接所述渗水井;所述渗水井的深度大于透水地层;所述渗水井底部在透水地层沿着井壁一周设置若干渗水孔;所述渗水孔采用钢筋格栅防护;所述渗水井侧壁设置若干消能侧板。
River flood control and flood water resource utilization system and construction method thereof
一种河道防洪及洪水水资源利用系统及其施工方法
OH SE-WOONG (author) / ZHAN YINI (author) / JIANG HAOJIANG (author) / REN ZHANLEI (author) / LI TIEYONG (author) / WU JIANGHUA (author) / DUAN MENGQIANG (author) / WANG JING (author) / TIAN CHUNQIANG (author)
2024-03-15
Patent
Electronic Resource
Chinese
Flood control river embankment and construction method thereof
European Patent Office | 2021
|River Water Resource Management and Flood Control Using GIS
TIBKAT | 2021
|River Water Resource Management and Flood Control Using GIS
Springer Verlag | 2020
|River flood prevention device and construction method thereof
European Patent Office | 2022
|