Rectangular pile hole repairing equipment and rectangular pile hole forming construction method
The invention relates to rectangular pile hole repairing equipment and a rectangular pile hole forming construction method.The rectangular pile hole forming construction method specifically comprises the following steps that S1, rotary excavating equipment is adopted for conducting hole guiding and deslagging on all rectangular pile holes in sequence; s2, hole repairing equipment capable of achieving autonomous construction is adopted to conduct independent hole repairing on the rectangular pile holes where hole guiding and slag discharging are completed in sequence; s3, deslagging is conducted on the rectangular pile holes subjected to independent hole repairing in sequence through rotary excavating equipment, and hole forming construction of all the rectangular pile holes is completed; when one or more rectangular pile holes in the step S1 are subjected to hole guiding and slag discharging, the step S2 is started; and when one or more rectangular pile holes in the step S2 are independently repaired, the step S3 is started. The whole construction procedure is continuous, the hole forming period of the rectangular piles in batches can be shortened, and the operation efficiency is improved; and meanwhile, the construction continuity of the rotary excavating equipment is higher, the leasing time of the equipment is shortened, and the construction cost is greatly reduced.
本发明涉及一种矩形桩修孔设备及矩形桩成孔的施工方法,其中,矩形桩成孔的施工方法,具体包括以下步骤:S1、采用旋挖设备依次对所有矩形桩孔进行引孔、出渣;S2、采用能够自主施工的修孔设备依次对已完成所述引孔、出渣的矩形桩孔进行独立修孔;S3、采用旋挖设备依次对已完成独立修孔的矩形桩孔进行出渣,完成所述所有矩形桩孔的成孔施工;在步骤S1中已有一个或多个矩形桩孔完成引孔、出渣时,即开始步骤S2;在步骤S2中已有一个或多个矩形桩孔完成独立修孔时,即开始步骤S3。整个施工工序为连续的,其可以缩短批次矩形桩成孔周期,提高了作业效率;同时,旋挖设备的施工连续性更高,缩短了设备的租赁时间,大幅降低施工成本。
Rectangular pile hole repairing equipment and rectangular pile hole forming construction method
The invention relates to rectangular pile hole repairing equipment and a rectangular pile hole forming construction method.The rectangular pile hole forming construction method specifically comprises the following steps that S1, rotary excavating equipment is adopted for conducting hole guiding and deslagging on all rectangular pile holes in sequence; s2, hole repairing equipment capable of achieving autonomous construction is adopted to conduct independent hole repairing on the rectangular pile holes where hole guiding and slag discharging are completed in sequence; s3, deslagging is conducted on the rectangular pile holes subjected to independent hole repairing in sequence through rotary excavating equipment, and hole forming construction of all the rectangular pile holes is completed; when one or more rectangular pile holes in the step S1 are subjected to hole guiding and slag discharging, the step S2 is started; and when one or more rectangular pile holes in the step S2 are independently repaired, the step S3 is started. The whole construction procedure is continuous, the hole forming period of the rectangular piles in batches can be shortened, and the operation efficiency is improved; and meanwhile, the construction continuity of the rotary excavating equipment is higher, the leasing time of the equipment is shortened, and the construction cost is greatly reduced.
本发明涉及一种矩形桩修孔设备及矩形桩成孔的施工方法,其中,矩形桩成孔的施工方法,具体包括以下步骤:S1、采用旋挖设备依次对所有矩形桩孔进行引孔、出渣;S2、采用能够自主施工的修孔设备依次对已完成所述引孔、出渣的矩形桩孔进行独立修孔;S3、采用旋挖设备依次对已完成独立修孔的矩形桩孔进行出渣,完成所述所有矩形桩孔的成孔施工;在步骤S1中已有一个或多个矩形桩孔完成引孔、出渣时,即开始步骤S2;在步骤S2中已有一个或多个矩形桩孔完成独立修孔时,即开始步骤S3。整个施工工序为连续的,其可以缩短批次矩形桩成孔周期,提高了作业效率;同时,旋挖设备的施工连续性更高,缩短了设备的租赁时间,大幅降低施工成本。
Rectangular pile hole repairing equipment and rectangular pile hole forming construction method
一种矩形桩修孔设备及矩形桩成孔的施工方法
ZHANG HAITAO (author) / WANG QINGNAN (author) / CAO ZHENBIAO (author)
2024-03-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Rectangular bored pile hole forming equipment and construction method
European Patent Office | 2023
|Rapid hole-forming construction method and device for rectangular pile in complex geology
European Patent Office | 2024
|Rectangular cast-in-place pile construction equipment and pile forming method thereof
European Patent Office | 2024
|European Patent Office | 2023
|Fast hole forming method for retaining wall type rectangular anti-slide pile
European Patent Office | 2022
|