A platform for research: civil engineering, architecture and urbanism
According to the inspection well system, an inspection well is composed of a concrete base, a plurality of concrete vertical plates, a concrete cover plate and a plurality of locking assemblies, when the inspection well is assembled, the multiple locking assemblies are connected between the concrete base and a concrete cover ring so that the multiple concrete vertical plates can be pressed and fixed, and the effect of facilitating transportation and assembly is achieved; the flexible sealing strips are symmetrically arranged on the two sides of the supporting strips, so that the ends of the arc-shaped sheet parts of the two flexible sealing strips between any two adjacent supporting strips abut against each other, and at the moment, the two flexible sealing strips between the two supporting strips play a sealing role; the effects of preventing odor from overflowing, preventing fallen leaves from falling in and preventing harmful insects from entering are achieved; when water needs to be drained, water can leak along the gap between the two flexible sealing strips, and the more the water amount gathered between the two supporting strips is, the higher the water leakage speed is. Meanwhile, due to the arrangement of the height adjusting mechanism, the inspection well cover can be flush with the ground after being installed.
本发明公开了一种窨井系统,窨井由混凝土底座、多个混凝土立板、混凝体盖板和多个锁紧组件组成,在窨井装配时,通过多个锁紧组件连接在混凝土底座、混凝土盖环之间,以实现压紧多个混凝土立板进行固定,具有方便运输、装配的作用;且通过在支撑条两侧对称设置有柔性密封条,使得任意相邻的两个支撑条之间的两个柔性密封条的弧形片部的端部相抵紧,此时两个支撑条之间的两个柔性密封条起到密封的作用,具有防止臭味溢散、防止落叶掉入以及防止有害昆虫进入的作用;在需要排水时,水可以沿着两个柔性密封条之间的间隙渗漏,且位于两个支撑条之间的聚集的水量越多,水渗漏速度越快;同时高度调节机构的设置,可使得窨井盖安装后与地面齐平。
According to the inspection well system, an inspection well is composed of a concrete base, a plurality of concrete vertical plates, a concrete cover plate and a plurality of locking assemblies, when the inspection well is assembled, the multiple locking assemblies are connected between the concrete base and a concrete cover ring so that the multiple concrete vertical plates can be pressed and fixed, and the effect of facilitating transportation and assembly is achieved; the flexible sealing strips are symmetrically arranged on the two sides of the supporting strips, so that the ends of the arc-shaped sheet parts of the two flexible sealing strips between any two adjacent supporting strips abut against each other, and at the moment, the two flexible sealing strips between the two supporting strips play a sealing role; the effects of preventing odor from overflowing, preventing fallen leaves from falling in and preventing harmful insects from entering are achieved; when water needs to be drained, water can leak along the gap between the two flexible sealing strips, and the more the water amount gathered between the two supporting strips is, the higher the water leakage speed is. Meanwhile, due to the arrangement of the height adjusting mechanism, the inspection well cover can be flush with the ground after being installed.
本发明公开了一种窨井系统,窨井由混凝土底座、多个混凝土立板、混凝体盖板和多个锁紧组件组成,在窨井装配时,通过多个锁紧组件连接在混凝土底座、混凝土盖环之间,以实现压紧多个混凝土立板进行固定,具有方便运输、装配的作用;且通过在支撑条两侧对称设置有柔性密封条,使得任意相邻的两个支撑条之间的两个柔性密封条的弧形片部的端部相抵紧,此时两个支撑条之间的两个柔性密封条起到密封的作用,具有防止臭味溢散、防止落叶掉入以及防止有害昆虫进入的作用;在需要排水时,水可以沿着两个柔性密封条之间的间隙渗漏,且位于两个支撑条之间的聚集的水量越多,水渗漏速度越快;同时高度调节机构的设置,可使得窨井盖安装后与地面齐平。
Inspection well construction technology and inspection well
European Patent Office | 2023
|