A platform for research: civil engineering, architecture and urbanism
Integral assembly type bridge whole-span beam transporting and erecting equipment
The invention discloses integral assembly type bridge whole span beam transporting and erecting equipment which comprises a first transporting and erecting rack and a second transporting and erecting rack, a first movable support is installed at the bottom of the first transporting and erecting rack in a positioning mode, and a second movable support is installed at the bottom of the second transporting and erecting rack in a positioning mode. A first high-strength movable wheel is movably arranged at the bottom of the first movable support, and a second high-strength movable wheel is movably arranged at the bottom of the second movable support. According to the overall assembly type bridge whole-span beam transporting and erecting equipment, the rack stable supporting mechanism, the bridge positioning and lifting mechanism and the rack stable connecting mechanism are arranged, so that the position of a bridge can be conveniently and better transported and stably supported, the stability during bridge butt joint is improved, the butt joint precision is higher, and the overall assembly type bridge whole-span beam transporting and erecting equipment is suitable for large-scale popularization and application. And stable positioning can be better carried out during bridge transportation, the bridge transportation is more stable, the safety is higher, and the position of the bridge can be conveniently adjusted.
本发明公开了一种整体装配式桥梁整跨梁运输架设装备,包括第一运输架设机架与第二运输架设机架,所述第一运输架设机架的底部定位安装有第一活动支座,所述第二运输架设机架的底部定位安装有第二活动支座,所述第一活动支座的底部活动设置有第一高强度活动轮,所述第二活动支座的底部活动设置有第二高强度活动轮。本发明所述的一种整体装配式桥梁整跨梁运输架设装备,设有机架稳定支撑机构、桥梁定位提升机构与机架稳定连接机构,能够方便更好的对桥梁的位置进行运输与稳定支撑,增加桥梁对接时的稳定性,对接精准更高,还可以更好的对桥梁运输时进行稳定定位,桥梁运输时更为稳定,安全性更高,便于进行桥梁位置的调节。
Integral assembly type bridge whole-span beam transporting and erecting equipment
The invention discloses integral assembly type bridge whole span beam transporting and erecting equipment which comprises a first transporting and erecting rack and a second transporting and erecting rack, a first movable support is installed at the bottom of the first transporting and erecting rack in a positioning mode, and a second movable support is installed at the bottom of the second transporting and erecting rack in a positioning mode. A first high-strength movable wheel is movably arranged at the bottom of the first movable support, and a second high-strength movable wheel is movably arranged at the bottom of the second movable support. According to the overall assembly type bridge whole-span beam transporting and erecting equipment, the rack stable supporting mechanism, the bridge positioning and lifting mechanism and the rack stable connecting mechanism are arranged, so that the position of a bridge can be conveniently and better transported and stably supported, the stability during bridge butt joint is improved, the butt joint precision is higher, and the overall assembly type bridge whole-span beam transporting and erecting equipment is suitable for large-scale popularization and application. And stable positioning can be better carried out during bridge transportation, the bridge transportation is more stable, the safety is higher, and the position of the bridge can be conveniently adjusted.
本发明公开了一种整体装配式桥梁整跨梁运输架设装备,包括第一运输架设机架与第二运输架设机架,所述第一运输架设机架的底部定位安装有第一活动支座,所述第二运输架设机架的底部定位安装有第二活动支座,所述第一活动支座的底部活动设置有第一高强度活动轮,所述第二活动支座的底部活动设置有第二高强度活动轮。本发明所述的一种整体装配式桥梁整跨梁运输架设装备,设有机架稳定支撑机构、桥梁定位提升机构与机架稳定连接机构,能够方便更好的对桥梁的位置进行运输与稳定支撑,增加桥梁对接时的稳定性,对接精准更高,还可以更好的对桥梁运输时进行稳定定位,桥梁运输时更为稳定,安全性更高,便于进行桥梁位置的调节。
Integral assembly type bridge whole-span beam transporting and erecting equipment
一种整体装配式桥梁整跨梁运输架设装备
WANG WEI (author) / QU JIXIANG (author) / CHEN SHI (author) / FU XIANGRU (author) / WANG ZHENGLAN (author) / PANG JINGJUN (author) / ZHANG ZHONGYUAN (author) / ZHANG HENGXIN (author) / WANG SHUJING (author) / WEI CONG (author)
2024-03-19
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Whole bridge span transporting and erecting equipment for integral assembly type bridge
European Patent Office | 2020
|European Patent Office | 2024
|Assembly type bridge integrated transporting and erecting construction method
European Patent Office | 2023
|Transporting and erecting longest plate girder bridge span in United States
Engineering Index Backfile | 1931
|