A platform for research: civil engineering, architecture and urbanism
Drainage construction method for parking apron foundation
The invention discloses a parking apron foundation drainage construction method which comprises an isolation shell, a laying mechanism and lifting adjusting mechanisms, the inner wall of the isolation shell is in sliding connection with the outer wall of the laying mechanism, the inner wall of the isolation shell is in sliding connection with the outer walls of the lifting adjusting mechanisms, and the number of the lifting adjusting mechanisms is four. The laying mechanism comprises a synchronous adjusting rod. The synchronous adjusting rod is pulled to drive the traction transmission belt, the traction transmission belt can pull the size adjusting rods and adjust the distance between the size adjusting rods when moving, therefore, the positions of the four sets of size adjusting rods can be synchronously adjusted, the positions of the size adjusting blocks can be synchronously adjusted, and the adjustable size can adapt to pits of different sizes; and by starting a motor in a size adjusting block, the output end of the motor can drive a lifting threaded rod to rotate and enable a lifting laying block to move downwards, at the moment, the geotechnical cloth can be extruded downwards and pushed to the pit bottom, and the effect that the geotechnical cloth does not need to be laid at the pit bottom manually is achieved.
本发明公开了一种停机坪地基排水施工方法,包括隔离外壳、铺设机构和升降调节机构,所述隔离外壳的内壁与铺设机构的外壁滑动连接,所述隔离外壳的内壁与升降调节机构的外壁滑动连接,且升降调节机构共有四组,所述铺设机构包括同步调节杆。通过拉动同步调节杆带动牵引传动带,牵引传动带在移动时会牵引尺寸调节杆,并调整尺寸调节杆之间的距离,由此可以同步调整四组尺寸调节杆的位置,并可以同步调整尺寸调整块的位置,可调整的尺寸可以适应不同尺寸的坑洞,通过启动尺寸调整块内部的电机,电机输出端会带动升降螺纹杆进行旋转,并且使升降铺设块向下移动,此时可以将土工布向下挤压,并推至坑底,达到无需人工下至坑底进行铺设土工布的效果。
Drainage construction method for parking apron foundation
The invention discloses a parking apron foundation drainage construction method which comprises an isolation shell, a laying mechanism and lifting adjusting mechanisms, the inner wall of the isolation shell is in sliding connection with the outer wall of the laying mechanism, the inner wall of the isolation shell is in sliding connection with the outer walls of the lifting adjusting mechanisms, and the number of the lifting adjusting mechanisms is four. The laying mechanism comprises a synchronous adjusting rod. The synchronous adjusting rod is pulled to drive the traction transmission belt, the traction transmission belt can pull the size adjusting rods and adjust the distance between the size adjusting rods when moving, therefore, the positions of the four sets of size adjusting rods can be synchronously adjusted, the positions of the size adjusting blocks can be synchronously adjusted, and the adjustable size can adapt to pits of different sizes; and by starting a motor in a size adjusting block, the output end of the motor can drive a lifting threaded rod to rotate and enable a lifting laying block to move downwards, at the moment, the geotechnical cloth can be extruded downwards and pushed to the pit bottom, and the effect that the geotechnical cloth does not need to be laid at the pit bottom manually is achieved.
本发明公开了一种停机坪地基排水施工方法,包括隔离外壳、铺设机构和升降调节机构,所述隔离外壳的内壁与铺设机构的外壁滑动连接,所述隔离外壳的内壁与升降调节机构的外壁滑动连接,且升降调节机构共有四组,所述铺设机构包括同步调节杆。通过拉动同步调节杆带动牵引传动带,牵引传动带在移动时会牵引尺寸调节杆,并调整尺寸调节杆之间的距离,由此可以同步调整四组尺寸调节杆的位置,并可以同步调整尺寸调整块的位置,可调整的尺寸可以适应不同尺寸的坑洞,通过启动尺寸调整块内部的电机,电机输出端会带动升降螺纹杆进行旋转,并且使升降铺设块向下移动,此时可以将土工布向下挤压,并推至坑底,达到无需人工下至坑底进行铺设土工布的效果。
Drainage construction method for parking apron foundation
一种停机坪地基排水施工方法
ZHANG JIE (author) / ZHOU HAISHAN (author) / NI ZHENG (author) / DENG BIN (author) / WANG XIAOLONG (author)
2024-03-19
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Double-deck drainage structure of parking apron with all-aluminum structure
European Patent Office | 2024
|Unmanned aerial vehicle parking apron and unmanned aerial vehicle parking apron system
European Patent Office | 2020
|