The invention relates to the technical field of building outer wall construction, and discloses an outer wall double-layer rock wool board installation method which comprises the following steps that an inner layer rock wool board and an outer layer rock wool board are selected according to the design size; the inner-layer rock wool board and the outer-layer rock wool board are connected in a staggered mode to form a double-layer rock wool board; an outer wall base layer is treated as a leveling layer, a rock wool board bracket is installed on an outer wall, and a plurality of transverse and vertical control lines are popped up; the multiple double-layer rock wool boards are sequentially installed and fixed to the outer wall from left to right and from bottom to top, the inner-layer rock wool boards and the outer-layer rock wool boards are connected in a staggered mode to form the double-layer rock wool boards, and the problem that through seams exist between the double-layer rock wool boards is avoided; and the situation that the inner-layer rock wool board and the outer-layer rock wool board with different thickness specifications are used upside down can be prevented, material waste is avoided, the construction period is shortened, and manpower and material resource cost is saved.
本发明涉及建筑物外墙施工技术领域,公开了一种外墙双层岩棉板的安装方法,包括以下步骤:根据设计尺寸选取内层岩棉板和外层岩棉板;将内层岩棉板和外层岩棉板错位连接制成双层岩棉板;外墙基层处理作找平层,并在外墙上安装岩棉板托架,弹出多根横竖向控制线;通过从左至右、从下至上的顺序依次将多块双层岩棉板安装固定在外墙上,本发明通过将内层岩棉板和外层岩棉板错位连接制成双层岩棉板,且避免了双层岩棉板间出现通缝的问题,并且可以防止不同厚度规格的内层岩棉板和外层岩棉板颠倒使用的情况发生,避免了材料的浪费,缩短了施工工期,节约了人力和物力成本。
Installation method of outer wall double-layer rock wool board
The invention relates to the technical field of building outer wall construction, and discloses an outer wall double-layer rock wool board installation method which comprises the following steps that an inner layer rock wool board and an outer layer rock wool board are selected according to the design size; the inner-layer rock wool board and the outer-layer rock wool board are connected in a staggered mode to form a double-layer rock wool board; an outer wall base layer is treated as a leveling layer, a rock wool board bracket is installed on an outer wall, and a plurality of transverse and vertical control lines are popped up; the multiple double-layer rock wool boards are sequentially installed and fixed to the outer wall from left to right and from bottom to top, the inner-layer rock wool boards and the outer-layer rock wool boards are connected in a staggered mode to form the double-layer rock wool boards, and the problem that through seams exist between the double-layer rock wool boards is avoided; and the situation that the inner-layer rock wool board and the outer-layer rock wool board with different thickness specifications are used upside down can be prevented, material waste is avoided, the construction period is shortened, and manpower and material resource cost is saved.
本发明涉及建筑物外墙施工技术领域,公开了一种外墙双层岩棉板的安装方法,包括以下步骤:根据设计尺寸选取内层岩棉板和外层岩棉板;将内层岩棉板和外层岩棉板错位连接制成双层岩棉板;外墙基层处理作找平层,并在外墙上安装岩棉板托架,弹出多根横竖向控制线;通过从左至右、从下至上的顺序依次将多块双层岩棉板安装固定在外墙上,本发明通过将内层岩棉板和外层岩棉板错位连接制成双层岩棉板,且避免了双层岩棉板间出现通缝的问题,并且可以防止不同厚度规格的内层岩棉板和外层岩棉板颠倒使用的情况发生,避免了材料的浪费,缩短了施工工期,节约了人力和物力成本。
Installation method of outer wall double-layer rock wool board
一种外墙双层岩棉板的安装方法
ZHANG JIANG (author) / LI YUANZHONG (author) / WANG ZILIANG (author) / ZHANG XIANGYONG (author) / REN WENHAN (author) / WANG JIN (author) / ZHANG XU (author) / GAO ZHANXIANG (author)
2024-03-19
Patent
Electronic Resource
Chinese
Installation and construction method of outer wall rock wool thermal insulation structure
European Patent Office | 2020
|Construction method for rock wool insulation board of outer wall
European Patent Office | 2024
|Double-layer rock wool ceiling and installation method thereof
European Patent Office | 2020
|