Offshore road construction method
The invention discloses an offshore road construction method, which comprises a roadbed construction step, and the roadbed construction step specifically comprises the following steps: step 1, establishing a lead control network and an elevation control network according to a lead point and a benchmark which are remeasured to be correct, setting out a red line range side pile, and scattering lime; secondly, the surface layer of the foundation is treated; thirdly, the foundation type is judged, and the foundation is replaced and filled according to the foundation type; fourthly, roadbed earth excavation is conducted; 5, filling roadbed construction is conducted; sixthly, drainage engineering construction is conducted; and 7, roadbed renovation and protection are conducted. According to the offshore road construction method, through the step of treating the pond in the third step, the effects that the drainage efficiency is higher, and the pond is treated more thoroughly can be effectively achieved.
本发明公开了一种近海道路施工方法,包括路基施工步骤,该路基施工步骤具体包括如下步骤:步骤一,根据复测无误的导线点及水准点,建立导线控制网和高程控制网,放样红线范围边桩并撒上白灰;步骤二,对地基表层进行处理;步骤三,判断地基类型,根据地基类型对地基进行换填处理;步骤四,进行路基土方开挖;步骤五,进行填方路基施工;步骤六,进行排水工程施工;步骤七,进行路基整修和防护。本发明的近海道路施工方法,通过步骤三中对于水塘进行处理的步骤,便可有效的实现排水效率更高,对于水塘的处理更加彻底的效果。
Offshore road construction method
The invention discloses an offshore road construction method, which comprises a roadbed construction step, and the roadbed construction step specifically comprises the following steps: step 1, establishing a lead control network and an elevation control network according to a lead point and a benchmark which are remeasured to be correct, setting out a red line range side pile, and scattering lime; secondly, the surface layer of the foundation is treated; thirdly, the foundation type is judged, and the foundation is replaced and filled according to the foundation type; fourthly, roadbed earth excavation is conducted; 5, filling roadbed construction is conducted; sixthly, drainage engineering construction is conducted; and 7, roadbed renovation and protection are conducted. According to the offshore road construction method, through the step of treating the pond in the third step, the effects that the drainage efficiency is higher, and the pond is treated more thoroughly can be effectively achieved.
本发明公开了一种近海道路施工方法,包括路基施工步骤,该路基施工步骤具体包括如下步骤:步骤一,根据复测无误的导线点及水准点,建立导线控制网和高程控制网,放样红线范围边桩并撒上白灰;步骤二,对地基表层进行处理;步骤三,判断地基类型,根据地基类型对地基进行换填处理;步骤四,进行路基土方开挖;步骤五,进行填方路基施工;步骤六,进行排水工程施工;步骤七,进行路基整修和防护。本发明的近海道路施工方法,通过步骤三中对于水塘进行处理的步骤,便可有效的实现排水效率更高,对于水塘的处理更加彻底的效果。
Offshore road construction method
近海道路施工方法
FAN ZHIWANG (author) / ZENG YONGJIAN (author) / CHEN JINGYI (author) / LIU CHAO (author) / ZHENG YUANLI (author) / ZHOU QINGXIANG (author) / YANG YIN (author) / ZHANG FUSHUN (author)
2024-03-22
Patent
Electronic Resource
Chinese