A platform for research: civil engineering, architecture and urbanism
Prefabricated tubular pile guide hole pile sinking equipment and construction method thereof
The invention provides prefabricated tubular pile hole guiding and pile sinking equipment and a construction method thereof. The prefabricated tubular pile hole guiding and pile sinking equipment comprises a movable fixing seat, a movable fixing seat and a pile guiding device, wherein a penetrating hole allowing a prefabricated tubular pile to penetrate through is formed in the movable fixing seat; the spiral punching column is used for penetrating through the through hole to punch downwards, the spiral punching column is installed on the supporting column in a lifting mode, and the supporting column is rotatably installed on the movable fixing base; the turning plate is installed on the movable fixing seat in a turnover mode, and an opening and closing clamp is connected to the turning plate; the traction mechanism comprises a supporting rod arranged at the end, close to the penetrating hole, of the turning plate, a pull rope is wound around the supporting rod, one end of the pull rope is connected to the end, away from the penetrating hole, of the turning plate, and the other end of the pull rope is wound in a winding disc. According to the device, the prefabricated pipe pile can be accurately and rapidly discharged, the hoisted prefabricated pipe pile does not need to be manually adjusted to be aligned with a hole, the construction safety is guaranteed, and the construction efficiency is improved.
本发明提供了一种预制管桩引孔沉桩设备及其施工方法,预制管桩引孔沉桩设备包括:移动式固定座,移动式固定座上开设有供预制管桩穿设的穿孔;用于穿过穿孔向下打孔的螺旋打孔柱,螺旋打孔柱可升降地安装于支撑柱上,支撑柱可转动地安装于移动式固定座上;翻板,可翻转安装于移动式固定座上,翻板上连接有开合的夹具;用于拉动翻板翻转至翻板上的预制管桩与穿孔中线重合的牵拉机构,包括设于翻板靠近穿孔一端的支撑杆,支撑杆上绕设有拉绳,拉绳的一端连接于翻板远离穿孔一端,拉绳的另一端收卷于收绞盘中。本发明能够对预制管桩进行精准快速的下料,不需要人工对吊起的预制管桩进行调整以对准孔洞,保证了施工安全,提高了施工效率。
Prefabricated tubular pile guide hole pile sinking equipment and construction method thereof
The invention provides prefabricated tubular pile hole guiding and pile sinking equipment and a construction method thereof. The prefabricated tubular pile hole guiding and pile sinking equipment comprises a movable fixing seat, a movable fixing seat and a pile guiding device, wherein a penetrating hole allowing a prefabricated tubular pile to penetrate through is formed in the movable fixing seat; the spiral punching column is used for penetrating through the through hole to punch downwards, the spiral punching column is installed on the supporting column in a lifting mode, and the supporting column is rotatably installed on the movable fixing base; the turning plate is installed on the movable fixing seat in a turnover mode, and an opening and closing clamp is connected to the turning plate; the traction mechanism comprises a supporting rod arranged at the end, close to the penetrating hole, of the turning plate, a pull rope is wound around the supporting rod, one end of the pull rope is connected to the end, away from the penetrating hole, of the turning plate, and the other end of the pull rope is wound in a winding disc. According to the device, the prefabricated pipe pile can be accurately and rapidly discharged, the hoisted prefabricated pipe pile does not need to be manually adjusted to be aligned with a hole, the construction safety is guaranteed, and the construction efficiency is improved.
本发明提供了一种预制管桩引孔沉桩设备及其施工方法,预制管桩引孔沉桩设备包括:移动式固定座,移动式固定座上开设有供预制管桩穿设的穿孔;用于穿过穿孔向下打孔的螺旋打孔柱,螺旋打孔柱可升降地安装于支撑柱上,支撑柱可转动地安装于移动式固定座上;翻板,可翻转安装于移动式固定座上,翻板上连接有开合的夹具;用于拉动翻板翻转至翻板上的预制管桩与穿孔中线重合的牵拉机构,包括设于翻板靠近穿孔一端的支撑杆,支撑杆上绕设有拉绳,拉绳的一端连接于翻板远离穿孔一端,拉绳的另一端收卷于收绞盘中。本发明能够对预制管桩进行精准快速的下料,不需要人工对吊起的预制管桩进行调整以对准孔洞,保证了施工安全,提高了施工效率。
Prefabricated tubular pile guide hole pile sinking equipment and construction method thereof
预制管桩引孔沉桩设备及其施工方法
WANG LONG (author) / YIN TENGTENG (author) / ZHU MINGJUN (author) / LI JIACHEN (author) / CHEN HUA (author) / BIAN HUI (author) / OU YAZHOU (author) / GUO ZHIXIN (author) / XIONG HAO (author) / PAN JUNJUN (author)
2024-03-22
Patent
Electronic Resource
Chinese
Guide hole and pile sinking integrated prefabricated pipe pile construction method
European Patent Office | 2023
|PHC tubular pile guide hole pile sinking construction method for deep soft foundation
European Patent Office | 2023
|Steel pipe pile deepwater guide hole pile sinking construction method
European Patent Office | 2023
|