A platform for research: civil engineering, architecture and urbanism
Slope bridge construction pile foundation bearing platform
The invention provides a pile foundation bearing platform for slope bridge construction, belongs to the technical field of pile foundation bearing platforms, and aims at solving the problems that in the construction process of an existing pile foundation bearing platform for slope bridge construction, after the shape of the bearing platform is set up through a formwork, concrete is used for pouring, and the formwork is removed after the concrete is solidified, operation is tedious, and construction cost is high. And the working efficiency is not high enough. Comprising a base; the number of the assembling columns is two, the two assembling columns are connected in an inserted mode, and the assembling column at the lower end is connected to the upper end of the base in an inserted mode. The top column is inserted into the upper end of the upper end assembly column; the multiple connecting steel bars are fixedly connected to the upper end face of the top column. The multiple grouting grooves are formed in the inner side of the base, the inner side of the assembly column and the inner side of the top column correspondingly. The assembling mechanism is arranged at the upper end of the base; through the arrangement, the bearing platform shell is mounted, the working efficiency is improved, and the labor intensity is reduced.
本发明提供一种斜坡桥梁施工桩基承台,属于桩基承台技术领域,以解决现有的斜坡桥梁施工桩基承台在施工过程中,需要使用模板搭设出承台的形状后,再使用混凝土进行浇筑,待混凝土凝固后再对模板进行拆除,操作较为繁琐,工作效率不够高的问题;包括:底座;所述组装柱设有两个,两个组装柱相互插接,下端组装柱插接在底座的上端;所述顶柱插接在上端组装柱的上端;所述连接钢筋设有多个,多个连接钢筋均固定连接在顶柱的上端面;所述灌浆槽设有多个,多个灌浆槽分别开设在底座、组装柱与顶柱的内侧;所述组装机构设置在底座的上端;通过本发明的设置,实现了对承台壳体的安装,提高了工作效率,降低了劳动强度。
Slope bridge construction pile foundation bearing platform
The invention provides a pile foundation bearing platform for slope bridge construction, belongs to the technical field of pile foundation bearing platforms, and aims at solving the problems that in the construction process of an existing pile foundation bearing platform for slope bridge construction, after the shape of the bearing platform is set up through a formwork, concrete is used for pouring, and the formwork is removed after the concrete is solidified, operation is tedious, and construction cost is high. And the working efficiency is not high enough. Comprising a base; the number of the assembling columns is two, the two assembling columns are connected in an inserted mode, and the assembling column at the lower end is connected to the upper end of the base in an inserted mode. The top column is inserted into the upper end of the upper end assembly column; the multiple connecting steel bars are fixedly connected to the upper end face of the top column. The multiple grouting grooves are formed in the inner side of the base, the inner side of the assembly column and the inner side of the top column correspondingly. The assembling mechanism is arranged at the upper end of the base; through the arrangement, the bearing platform shell is mounted, the working efficiency is improved, and the labor intensity is reduced.
本发明提供一种斜坡桥梁施工桩基承台,属于桩基承台技术领域,以解决现有的斜坡桥梁施工桩基承台在施工过程中,需要使用模板搭设出承台的形状后,再使用混凝土进行浇筑,待混凝土凝固后再对模板进行拆除,操作较为繁琐,工作效率不够高的问题;包括:底座;所述组装柱设有两个,两个组装柱相互插接,下端组装柱插接在底座的上端;所述顶柱插接在上端组装柱的上端;所述连接钢筋设有多个,多个连接钢筋均固定连接在顶柱的上端面;所述灌浆槽设有多个,多个灌浆槽分别开设在底座、组装柱与顶柱的内侧;所述组装机构设置在底座的上端;通过本发明的设置,实现了对承台壳体的安装,提高了工作效率,降低了劳动强度。
Slope bridge construction pile foundation bearing platform
一种斜坡桥梁施工桩基承台
ZHAO JIANBO (author) / WANG XIONG (author) / LI HUA (author) / YANG WANBAO (author) / LI MINGZHAO (author) / KIM SEOK (author) / ZHAO TIANLE (author) / WANG XUAN (author)
2024-03-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Bridge high-pile bearing platform, bridge pile foundation structure and construction method thereof
European Patent Office | 2020
|Construction method of deep foundation pit sandy soil slope pile foundation bearing platform
European Patent Office | 2023
|Trestle-free overwater bridge pile foundation and bearing platform construction method
European Patent Office | 2020
|European Patent Office | 2024