A platform for research: civil engineering, architecture and urbanism
Form removal instrument for power grid infrastructure construction
The invention discloses a form removal instrument for power grid infrastructure construction. The form removal instrument for power grid infrastructure construction comprises a main pipe, a plug plate, a supporting assembly, a positioning assembly, an auxiliary pipe and a form removal head. The left end of the main pipe is in sliding fit with the right end of the auxiliary pipe, the auxiliary pipe axially reciprocates along a through cavity of the main pipe, the left end of the auxiliary pipe is connected with the right end of the mold removal head, a plurality of anti-disengaging holes are formed in the top of the auxiliary pipe, a positioning assembly is installed at the top of the front end of the main pipe, and the bottom end of the positioning assembly penetrates through the main pipe and then is in clamping fit with the corresponding anti-disengaging holes. A sliding groove with an opening facing the right side is formed in the top of the main pipe, a plurality of positioning holes are evenly formed in the sliding groove, the sliding groove is located on the right side of the positioning assembly, the inner wall of the sliding groove is in sliding fit with a supporting assembly, the right end of the main pipe is connected with the left end of the plug plate, and the supporting assembly reciprocates between the main pipe and the plug plate along the sliding groove. According to the design, supporting points can be adjusted according to actual use requirements, so that prying work is more labor-saving and convenient.
一种电网基建施工用的拆模器械,所述电网基建施工用的拆模器械包括主管、堵头板、支撑组件、定位组件、副管和拆模头;所述主管的左端与副管的右端滑动配合,副管沿主管的通腔轴向往复运动,副管的左端与拆模头的右端连接,副管的顶部开设有多个防脱孔,主管的前端顶部安装有定位组件,定位组件的底端贯穿主管后与对应的防脱孔卡接配合;所述主管的顶部开设有开口朝向右侧的滑槽,滑槽内均匀设置有多个定位孔,滑槽位于定位组件的右侧,滑槽的内壁滑动配合有支撑组件,主管的右端与堵头板的左端连接,支撑组件沿滑槽在主管与堵头板之间往复运动。本设计可以根据实际的使用需求来调节支撑点,从而使得撬起工作更加的省力与方便。
Form removal instrument for power grid infrastructure construction
The invention discloses a form removal instrument for power grid infrastructure construction. The form removal instrument for power grid infrastructure construction comprises a main pipe, a plug plate, a supporting assembly, a positioning assembly, an auxiliary pipe and a form removal head. The left end of the main pipe is in sliding fit with the right end of the auxiliary pipe, the auxiliary pipe axially reciprocates along a through cavity of the main pipe, the left end of the auxiliary pipe is connected with the right end of the mold removal head, a plurality of anti-disengaging holes are formed in the top of the auxiliary pipe, a positioning assembly is installed at the top of the front end of the main pipe, and the bottom end of the positioning assembly penetrates through the main pipe and then is in clamping fit with the corresponding anti-disengaging holes. A sliding groove with an opening facing the right side is formed in the top of the main pipe, a plurality of positioning holes are evenly formed in the sliding groove, the sliding groove is located on the right side of the positioning assembly, the inner wall of the sliding groove is in sliding fit with a supporting assembly, the right end of the main pipe is connected with the left end of the plug plate, and the supporting assembly reciprocates between the main pipe and the plug plate along the sliding groove. According to the design, supporting points can be adjusted according to actual use requirements, so that prying work is more labor-saving and convenient.
一种电网基建施工用的拆模器械,所述电网基建施工用的拆模器械包括主管、堵头板、支撑组件、定位组件、副管和拆模头;所述主管的左端与副管的右端滑动配合,副管沿主管的通腔轴向往复运动,副管的左端与拆模头的右端连接,副管的顶部开设有多个防脱孔,主管的前端顶部安装有定位组件,定位组件的底端贯穿主管后与对应的防脱孔卡接配合;所述主管的顶部开设有开口朝向右侧的滑槽,滑槽内均匀设置有多个定位孔,滑槽位于定位组件的右侧,滑槽的内壁滑动配合有支撑组件,主管的右端与堵头板的左端连接,支撑组件沿滑槽在主管与堵头板之间往复运动。本设计可以根据实际的使用需求来调节支撑点,从而使得撬起工作更加的省力与方便。
Form removal instrument for power grid infrastructure construction
一种电网基建施工用的拆模器械
HUANG ZHENXI (author) / HE LANFEI (author) / HU JIA (author) / CHEN RAN (author) / ZHOU LUO (author) / ZHANG HONG (author) / CHEN XIN (author) / YANG LIN (author) / XU LINGFENG (author) / CAI JIE (author)
2024-03-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction safety protection device for power grid infrastructure construction
European Patent Office | 2023
|Future-Proofing Energy Infrastructure: Power Grid Risk Assessment
Springer Verlag | 2025
|European Patent Office | 2023
|Nuclear power station hyperboloid in-situ installation construction method free of form removal
European Patent Office | 2023
|