A platform for research: civil engineering, architecture and urbanism
Prefabricated building prefabricated beam-column joint temporary supporting tool and application method
The invention discloses a prefabricated building prefabricated beam-column joint temporary supporting tool and an application method, and belongs to the technical field of prefabricated constructions.The prefabricated building prefabricated beam-column joint temporary supporting tool is composed of a temporary horizontal reinforcing assembly, a temporary vertical supporting assembly and a pre-buried assembly, and the pre-buried assembly is buried in a prefabricated column and used for supporting the temporary vertical supporting assembly on the same side as the pre-buried assembly; the temporary vertical supporting assemblies are detachably pulled and fixed to the prefabricated columns and used for supporting the prefabricated main beams on the same sides of the temporary vertical supporting assemblies, and the temporary horizontal reinforcing assemblies are detachably and fixedly connected between every two adjacent prefabricated main beams. Through a complete set of implementation mode from the prefabricated part production stage to the construction, installation and pouring stage, self-supporting of the components is achieved in the small space range of a beam column joint area, the temporary placement problem of the main beam on the column is solved, a complex traditional construction supporting frame system around the column and under the beam is effectively omitted, and the supporting-free design of the prefabricated beams and plates is matched, so that the construction efficiency is improved. Temporary supporting measures in the construction stage can be greatly simplified, and the construction efficiency is improved.
本发明公开了一种装配式建筑预制梁柱节点临时支撑工装及应用方法,属于装配式建筑技术领域,它由临时水平加强组件、临时竖向支撑组件和预埋组件构成,预埋组件埋设于预制柱内并用于支承与之同侧的临时竖向支撑组件,临时竖向支撑组件能拆卸地拉固于预制柱上并用于支承与之同侧的预制主梁,临时水平加强组件能拆卸地固接于两个相邻的预制主梁之间。本发明通过预制构件生产阶段至构建安装浇筑阶段的成套实施方式,于梁柱节点区较小空间范围内实现构件自支承,解决主梁在柱上的临时搁置问题,有效免去柱周边及梁下繁复的传统施工支撑架体系,并配合预制梁、板的免支撑设计,可大幅简化建造阶段临时支撑措施,提高建造效率。
Prefabricated building prefabricated beam-column joint temporary supporting tool and application method
The invention discloses a prefabricated building prefabricated beam-column joint temporary supporting tool and an application method, and belongs to the technical field of prefabricated constructions.The prefabricated building prefabricated beam-column joint temporary supporting tool is composed of a temporary horizontal reinforcing assembly, a temporary vertical supporting assembly and a pre-buried assembly, and the pre-buried assembly is buried in a prefabricated column and used for supporting the temporary vertical supporting assembly on the same side as the pre-buried assembly; the temporary vertical supporting assemblies are detachably pulled and fixed to the prefabricated columns and used for supporting the prefabricated main beams on the same sides of the temporary vertical supporting assemblies, and the temporary horizontal reinforcing assemblies are detachably and fixedly connected between every two adjacent prefabricated main beams. Through a complete set of implementation mode from the prefabricated part production stage to the construction, installation and pouring stage, self-supporting of the components is achieved in the small space range of a beam column joint area, the temporary placement problem of the main beam on the column is solved, a complex traditional construction supporting frame system around the column and under the beam is effectively omitted, and the supporting-free design of the prefabricated beams and plates is matched, so that the construction efficiency is improved. Temporary supporting measures in the construction stage can be greatly simplified, and the construction efficiency is improved.
本发明公开了一种装配式建筑预制梁柱节点临时支撑工装及应用方法,属于装配式建筑技术领域,它由临时水平加强组件、临时竖向支撑组件和预埋组件构成,预埋组件埋设于预制柱内并用于支承与之同侧的临时竖向支撑组件,临时竖向支撑组件能拆卸地拉固于预制柱上并用于支承与之同侧的预制主梁,临时水平加强组件能拆卸地固接于两个相邻的预制主梁之间。本发明通过预制构件生产阶段至构建安装浇筑阶段的成套实施方式,于梁柱节点区较小空间范围内实现构件自支承,解决主梁在柱上的临时搁置问题,有效免去柱周边及梁下繁复的传统施工支撑架体系,并配合预制梁、板的免支撑设计,可大幅简化建造阶段临时支撑措施,提高建造效率。
Prefabricated building prefabricated beam-column joint temporary supporting tool and application method
一种装配式建筑预制梁柱节点临时支撑工装及应用方法
TANG YI (author) / GUO YE (author) / LIU LEI (author) / ZHANG XINGJIE (author) / CHEN ZHUANWEN (author) / HUANG HAO (author)
2024-03-29
Patent
Electronic Resource
Chinese
Prefabricated building beam-column joint connection structure
European Patent Office | 2020
|European Patent Office | 2022
|Prefabricated column and prefabricated beam connecting joint and construction method
European Patent Office | 2023
|European Patent Office | 2021
|