A platform for research: civil engineering, architecture and urbanism
Project progress management equipment for building engineering project management
The invention relates to the technical field of constructional engineering, and provides a project progress management device for constructional engineering project management, and the device comprises a display rack which is used for providing a basic installation frame; the outer side of the transparent glass is fixedly connected to the inner front end of the showing stand, a movable plate is fixedly connected to the output end of the electric push rod, inclined blocks are fixedly connected to the upper portions of the two sides of the front end of the movable plate, lower clamping plates are fixedly connected to the two sides of the bottom of the movable plate, and first connecting frames are rotationally connected to the bottom ends of the upper clamping plates on the two sides; first rotating plates are slidably connected to the interiors of the first connecting frames on the two sides correspondingly, and first trapezoidal balancing weights are rotatably connected to the bottom ends of the first rotating plates on the two sides correspondingly. Through movement of the inclined block and the lower clamping plate, the first trapezoidal balancing weight, the first rotating plate and the first connecting frame can drive the upper clamping plate to rotate so as to fix or loosen a progress meter, and the progress meter can be smoothed through the smoothing mechanism so as to guarantee the smoothness of the progress meter.
本申请涉及建筑工程技术领域,提供了一种建筑工程项目管理用项目进度管理设备,包括展示架,其用于提供基础安装框架;透明玻璃,所述透明玻璃外侧固定连接在展示架内前端,所述电动推杆输出端固定连接有活动板,所述活动板前端两侧上部均固定连接有斜块,所述活动板底部两侧均固定连接有下夹板,两侧所述上夹板底端均转动连接有连接架一,两侧所述连接架一内部均滑动连接有转板一,两侧所述转板一底端均转动连接有梯形配重块一。本发明通过斜块和下夹板的移动,使得梯形配重块一、转板一、连接架一可带动上夹板转动,以对进度表进行固定或松开,并通过抚平机构可对进度表进行抚平,以保证进度表的平整性。
Project progress management equipment for building engineering project management
The invention relates to the technical field of constructional engineering, and provides a project progress management device for constructional engineering project management, and the device comprises a display rack which is used for providing a basic installation frame; the outer side of the transparent glass is fixedly connected to the inner front end of the showing stand, a movable plate is fixedly connected to the output end of the electric push rod, inclined blocks are fixedly connected to the upper portions of the two sides of the front end of the movable plate, lower clamping plates are fixedly connected to the two sides of the bottom of the movable plate, and first connecting frames are rotationally connected to the bottom ends of the upper clamping plates on the two sides; first rotating plates are slidably connected to the interiors of the first connecting frames on the two sides correspondingly, and first trapezoidal balancing weights are rotatably connected to the bottom ends of the first rotating plates on the two sides correspondingly. Through movement of the inclined block and the lower clamping plate, the first trapezoidal balancing weight, the first rotating plate and the first connecting frame can drive the upper clamping plate to rotate so as to fix or loosen a progress meter, and the progress meter can be smoothed through the smoothing mechanism so as to guarantee the smoothness of the progress meter.
本申请涉及建筑工程技术领域,提供了一种建筑工程项目管理用项目进度管理设备,包括展示架,其用于提供基础安装框架;透明玻璃,所述透明玻璃外侧固定连接在展示架内前端,所述电动推杆输出端固定连接有活动板,所述活动板前端两侧上部均固定连接有斜块,所述活动板底部两侧均固定连接有下夹板,两侧所述上夹板底端均转动连接有连接架一,两侧所述连接架一内部均滑动连接有转板一,两侧所述转板一底端均转动连接有梯形配重块一。本发明通过斜块和下夹板的移动,使得梯形配重块一、转板一、连接架一可带动上夹板转动,以对进度表进行固定或松开,并通过抚平机构可对进度表进行抚平,以保证进度表的平整性。
Project progress management equipment for building engineering project management
一种建筑工程项目管理用项目进度管理设备
XIAO JIAYOU (author) / LI CHONGYANG (author) / YUAN HUI (author) / SONG LEI (author) / CHANG WENWEN (author) / XING LIDONG (author)
2024-03-29
Patent
Electronic Resource
Chinese
IPC:
G09F
DISPLAYING
,
Anzeigewesen
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
F03D
Windkraftmaschinen
,
WIND MOTORS
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
H05K
PRINTED CIRCUITS
,
Gedruckte Schaltungen
Engineering project management
TIBKAT | 1995
|Engineering project management
TIBKAT | 2002
|Project management in building
TIBKAT | 1982
|Civil engineering project management
TIBKAT | 2004
|Engineering project risk management
IET Digital Library Archive | 2000