A platform for research: civil engineering, architecture and urbanism
Water conservancy project foundation pit tube well landfill construction method
The invention relates to the technical field of hydraulic engineering foundation pit tube well landfill, and particularly provides a hydraulic engineering foundation pit tube well landfill construction method which specifically comprises the following steps of early-stage preparation, construction preparation, landfill operation and post-treatment. The invention further particularly relates to hydraulic engineering foundation pit tube well landfill construction equipment in the foundation pit landfill process through the hydraulic engineering foundation pit tube well landfill construction method, the hydraulic engineering foundation pit tube well landfill construction equipment comprises a fixing mechanism and a moving mechanism, and according to cooperation of the fixing mechanism and the moving mechanism provided by the embodiment of the invention, in the foundation pit tube well landfill process, the fixing mechanism is fixed to the moving mechanism, and therefore the foundation pit tube well can be conveniently and rapidly landfilled. According to the filling device, filling materials of a foundation pit can be controlled to be filled layer by layer, through continuous filling layer by layer, vibration operation can be carried out in the filling process, it can be guaranteed that the filling materials are evenly distributed and compact, the filling material layer has better stability, and meanwhile the filling operation can be more standard through the continuous filling layer by layer method, so that the filling efficiency is improved. And therefore, the landfill work can be completed more efficiently.
本发明涉及水利工程基坑管井填埋技术领域,具体提出了一种水利工程基坑管井填埋施工方法,具体包括以下步骤:前期准备、施工准备、填埋操作和后期处理,采用水利工程基坑管井填埋施工方法在对基坑进行填埋的过程中还具体涉及到一种水利工程基坑管井填埋施工设备,包括固定机构和移动机构,根据本发明实施例提供的固定机构和移动机构的配合,在对基坑管井进行填埋的过程中,能够控制基坑的填埋材料进行逐层填埋,通过连续逐层的填料,且填料的过程中能够进行振时操作,可以保证填料均匀分布且密实,使填料层具有更好的稳定性,同时连续的逐层填料的方法可以使填埋作业更加的规范,进而能够更高效地完成填埋工作。
Water conservancy project foundation pit tube well landfill construction method
The invention relates to the technical field of hydraulic engineering foundation pit tube well landfill, and particularly provides a hydraulic engineering foundation pit tube well landfill construction method which specifically comprises the following steps of early-stage preparation, construction preparation, landfill operation and post-treatment. The invention further particularly relates to hydraulic engineering foundation pit tube well landfill construction equipment in the foundation pit landfill process through the hydraulic engineering foundation pit tube well landfill construction method, the hydraulic engineering foundation pit tube well landfill construction equipment comprises a fixing mechanism and a moving mechanism, and according to cooperation of the fixing mechanism and the moving mechanism provided by the embodiment of the invention, in the foundation pit tube well landfill process, the fixing mechanism is fixed to the moving mechanism, and therefore the foundation pit tube well can be conveniently and rapidly landfilled. According to the filling device, filling materials of a foundation pit can be controlled to be filled layer by layer, through continuous filling layer by layer, vibration operation can be carried out in the filling process, it can be guaranteed that the filling materials are evenly distributed and compact, the filling material layer has better stability, and meanwhile the filling operation can be more standard through the continuous filling layer by layer method, so that the filling efficiency is improved. And therefore, the landfill work can be completed more efficiently.
本发明涉及水利工程基坑管井填埋技术领域,具体提出了一种水利工程基坑管井填埋施工方法,具体包括以下步骤:前期准备、施工准备、填埋操作和后期处理,采用水利工程基坑管井填埋施工方法在对基坑进行填埋的过程中还具体涉及到一种水利工程基坑管井填埋施工设备,包括固定机构和移动机构,根据本发明实施例提供的固定机构和移动机构的配合,在对基坑管井进行填埋的过程中,能够控制基坑的填埋材料进行逐层填埋,通过连续逐层的填料,且填料的过程中能够进行振时操作,可以保证填料均匀分布且密实,使填料层具有更好的稳定性,同时连续的逐层填料的方法可以使填埋作业更加的规范,进而能够更高效地完成填埋工作。
Water conservancy project foundation pit tube well landfill construction method
一种水利工程基坑管井填埋施工方法
YANG YILIANG (author) / DING DIANYUAN (author) / CUI FEI (author) / ZHAO YONGGANG (author) / JIANG XIAOHONG (author) / XU ZHENGSONG (author) / LI HUAWEI (author) / HE QIANG (author) / YANG QIONG (author) / WANG KEKE (author)
2024-04-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Water conservancy project foundation pit tube well landfill device
European Patent Office | 2021
|Water conservancy project foundation pit tube well landfill device
European Patent Office | 2022
|European Patent Office | 2020
|European Patent Office | 2022
|European Patent Office | 2021
|