A platform for research: civil engineering, architecture and urbanism
Automatic formwork opening and closing system capable of climbing integrally with integral steel platform formwork equipment
The invention provides an automatic template opening and closing system capable of integrally climbing with integral steel platform formwork equipment, which comprises a large steel template, a plurality of template opening and closing mechanisms, a perpendicularity sensor, a levelness sensor and a controller, and is characterized in that the large steel template is connected with a stand column of the integral steel platform formwork equipment through the plurality of template opening and closing mechanisms; the perpendicularity sensor is arranged on the side face of the large steel formwork, the levelness sensor is arranged on the top face or the bottom face of the large steel formwork, and the formwork opening and closing mechanisms, the perpendicularity sensor and the levelness sensor are connected with the controller. Automatic mold closing and mold releasing of the large steel mold plates can be achieved through the multiple mold plate opening and closing mechanisms. Automatic mold closing and demolding of the large steel formwork can be achieved through the multiple formwork opening and closing mechanisms, manpower can be effectively saved, the labor intensity is greatly reduced, the large steel formwork and the overall formwork equipment adopt integrated climbing, in the demolding process of the large steel formwork, upper-layer reinforcing steel bars can be bound at the same time, and the overall formwork equipment is convenient to use. And the construction efficiency is effectively improved.
本发明提供的一种与整体钢平台模架装备一体爬升的自动开合模板系统,包括钢大模板、若干模板开合模机构、垂直度传感器、水平度传感器以及控制器,所述钢大模板通过所述若干模板开合模机构与整体钢平台模架装备的立柱连接,所述垂直度传感器设置于所述钢大模板的侧面,所述水平度传感器设置于所述钢大模板的顶面或者底面上,所述若干模板开合模机构、垂直度传感器以及水平度传感器分别与控制器连接,通过所述若干模板开合模机构能够实现钢大模板的自动合模与退模。本发明通过所述若干模板开合模机构能够实现钢大模板的自动合模与退模,能够有效节省人工,大幅降低劳动强度,且本发明的钢大模板与整体模架装备采用一体化爬升,能够在钢大模板退模的过程中,同时绑扎上层钢筋,有效提高了施工效率。
Automatic formwork opening and closing system capable of climbing integrally with integral steel platform formwork equipment
The invention provides an automatic template opening and closing system capable of integrally climbing with integral steel platform formwork equipment, which comprises a large steel template, a plurality of template opening and closing mechanisms, a perpendicularity sensor, a levelness sensor and a controller, and is characterized in that the large steel template is connected with a stand column of the integral steel platform formwork equipment through the plurality of template opening and closing mechanisms; the perpendicularity sensor is arranged on the side face of the large steel formwork, the levelness sensor is arranged on the top face or the bottom face of the large steel formwork, and the formwork opening and closing mechanisms, the perpendicularity sensor and the levelness sensor are connected with the controller. Automatic mold closing and mold releasing of the large steel mold plates can be achieved through the multiple mold plate opening and closing mechanisms. Automatic mold closing and demolding of the large steel formwork can be achieved through the multiple formwork opening and closing mechanisms, manpower can be effectively saved, the labor intensity is greatly reduced, the large steel formwork and the overall formwork equipment adopt integrated climbing, in the demolding process of the large steel formwork, upper-layer reinforcing steel bars can be bound at the same time, and the overall formwork equipment is convenient to use. And the construction efficiency is effectively improved.
本发明提供的一种与整体钢平台模架装备一体爬升的自动开合模板系统,包括钢大模板、若干模板开合模机构、垂直度传感器、水平度传感器以及控制器,所述钢大模板通过所述若干模板开合模机构与整体钢平台模架装备的立柱连接,所述垂直度传感器设置于所述钢大模板的侧面,所述水平度传感器设置于所述钢大模板的顶面或者底面上,所述若干模板开合模机构、垂直度传感器以及水平度传感器分别与控制器连接,通过所述若干模板开合模机构能够实现钢大模板的自动合模与退模。本发明通过所述若干模板开合模机构能够实现钢大模板的自动合模与退模,能够有效节省人工,大幅降低劳动强度,且本发明的钢大模板与整体模架装备采用一体化爬升,能够在钢大模板退模的过程中,同时绑扎上层钢筋,有效提高了施工效率。
Automatic formwork opening and closing system capable of climbing integrally with integral steel platform formwork equipment
一种与整体钢平台模架装备一体爬升的自动开合模板系统
FANG TINGCHEN (author) / GONG JIAN (author) / WANG QINGCHUN (author) / WU LIANDING (author)
2024-04-05
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Integral climbing steel platform formwork and climbing method thereof
European Patent Office | 2023
|Automatic opening and closing combined formwork assembly
European Patent Office | 2022
|Using method of formwork system integrated on integral steel platform formwork equipment
European Patent Office | 2024
|