Fabricated concrete structure beam-column joint capable of being rapidly installed and construction method of fabricated concrete structure beam-column joint
The invention belongs to the technical field of structural engineering, and particularly relates to a quickly-mounted fabricated concrete structure beam-column joint and a construction method thereof. A connecting block is fixedly installed on one side of the stand column, a steel bar column is fixedly installed at the top end of the connecting block, a cross beam is installed on one side of the steel bar column, a steel bar ring is fixedly installed on the side, close to the steel bar column, of the cross beam, and a correcting assembly is arranged at the top end of the cross beam. By arranging the correcting assembly and the fixing assembly, when component positioning is carried out, a crane is controlled to move the cross beam to the position above the connecting block, the position of the cross beam is corrected through the correcting assembly and the fixing assembly, then the crane is controlled to enable the cross beam to move downwards, component positioning is completed, and the situation that when a hoisting machine is used for hoisting a precast beam to a designed position, the cross beam is damaged is avoided. The problems of complicated construction operation and low efficiency caused by repeated position correction of a crane in the prior art are solved, and the position correction of the cross beam is simpler, more convenient and quicker and more accurate.
本发明属于结构工程技术领域,具体的说是一种快速安装的装配式混凝土结构梁柱节点及其施工方法,包括立柱;所述立柱的一侧固定安装有连接块,所述连接块的顶端固定安装有钢筋柱,所述钢筋柱的一侧安装有横梁,所述横梁靠近钢筋柱的一侧固定安装有钢筋圈,所述横梁的顶端设置有校正组件;通过设置校正组件和固定组件,在进行构件定位时,操控吊车将横梁移动至连接块上方,通过校正组件和固定组件,对横梁的位置进行校正,再操控吊车使横梁向下移动,完成构件定位,避免了在利用起重机械将预制梁吊装至设计位置时,需要起重机反复进行位置校正,造成施工操作繁琐,效率低下的问题,使横梁位置的校正更加简便快捷,使横梁位置的校正更加精确。
Fabricated concrete structure beam-column joint capable of being rapidly installed and construction method of fabricated concrete structure beam-column joint
The invention belongs to the technical field of structural engineering, and particularly relates to a quickly-mounted fabricated concrete structure beam-column joint and a construction method thereof. A connecting block is fixedly installed on one side of the stand column, a steel bar column is fixedly installed at the top end of the connecting block, a cross beam is installed on one side of the steel bar column, a steel bar ring is fixedly installed on the side, close to the steel bar column, of the cross beam, and a correcting assembly is arranged at the top end of the cross beam. By arranging the correcting assembly and the fixing assembly, when component positioning is carried out, a crane is controlled to move the cross beam to the position above the connecting block, the position of the cross beam is corrected through the correcting assembly and the fixing assembly, then the crane is controlled to enable the cross beam to move downwards, component positioning is completed, and the situation that when a hoisting machine is used for hoisting a precast beam to a designed position, the cross beam is damaged is avoided. The problems of complicated construction operation and low efficiency caused by repeated position correction of a crane in the prior art are solved, and the position correction of the cross beam is simpler, more convenient and quicker and more accurate.
本发明属于结构工程技术领域,具体的说是一种快速安装的装配式混凝土结构梁柱节点及其施工方法,包括立柱;所述立柱的一侧固定安装有连接块,所述连接块的顶端固定安装有钢筋柱,所述钢筋柱的一侧安装有横梁,所述横梁靠近钢筋柱的一侧固定安装有钢筋圈,所述横梁的顶端设置有校正组件;通过设置校正组件和固定组件,在进行构件定位时,操控吊车将横梁移动至连接块上方,通过校正组件和固定组件,对横梁的位置进行校正,再操控吊车使横梁向下移动,完成构件定位,避免了在利用起重机械将预制梁吊装至设计位置时,需要起重机反复进行位置校正,造成施工操作繁琐,效率低下的问题,使横梁位置的校正更加简便快捷,使横梁位置的校正更加精确。
Fabricated concrete structure beam-column joint capable of being rapidly installed and construction method of fabricated concrete structure beam-column joint
一种快速安装的装配式混凝土结构梁柱节点及其施工方法
ZHUANG ZHIZHENG (author) / ZHANG HONGYU (author) / ZHANG LONG (author) / HU PINGPING (author) / LIANG CHEN (author)
2024-04-09
Patent
Electronic Resource
Chinese
Fabricated concrete beam-column joint construction technology
European Patent Office | 2024
|Fabricated concrete beam-column joint and construction method
European Patent Office | 2024
|Novel fabricated reinforced concrete structure beam-column joint
European Patent Office | 2020
|