A platform for research: civil engineering, architecture and urbanism
Modularized building construction method and device
The invention relates to the technical field of fabricated buildings, in particular to a modular building construction method and device, and the modular building construction method comprises the steps that a connecting part capable of rotating by 180 degrees is arranged; the connecting part is provided with two hoisting parts which abut against each other; the two hoisting parts which abut against each other can still abut against each other after rotating by 180 degrees through the connecting part, after the two hoisting parts are connected through the connecting part, the hoisting parts can have the unfolded state and the folded state, the hoisting parts can be suitable for vertical hoisting after being folded, and the hoisting parts can be suitable for horizontal hoisting after being unfolded; in the hoisting process, the slings are connected to the connecting parts, the fabricated building is driven to ascend and descend through the connecting parts, vertical hoisting can be conducted in a folding mode when the fabricated building is hoisted in a vertical state, the hoisting process is more stable, a side-plate-shaped building can be conveniently built, and when the fabricated building is hoisted in a plane mode, the hoisting efficiency is improved. And the hoisting component can be unfolded for use, so that a roof-shaped building can be conveniently built.
本发明涉及装配式建筑技术领域,尤其是一种模块化建筑搭建方法及其装置,包括,设置一个能够转动一百八十度的连接部件;在该连接部件上设置两个相互抵触的吊装部件;两个相互抵触的吊装部件通过连接部件转动一百八十度后依旧能够相互抵触,本发明通过连接部件连接两个吊装部件后,吊装部件能够具备展开和折叠的两种状态,折叠后能够适用于竖直吊装,展开后能够适用于水平吊装,吊装过程中吊索连接在连接部件上,通过连接部件带动装配式建筑进行升降,在面对竖直状态的吊装时,可以采用折叠的方式进行竖直吊装,吊装过程更加平稳,便于对侧板形的建筑进行搭建,在面对平面吊装时,可以将吊装部件进行展开使用,便于对顶板形的建筑进行搭建。
Modularized building construction method and device
The invention relates to the technical field of fabricated buildings, in particular to a modular building construction method and device, and the modular building construction method comprises the steps that a connecting part capable of rotating by 180 degrees is arranged; the connecting part is provided with two hoisting parts which abut against each other; the two hoisting parts which abut against each other can still abut against each other after rotating by 180 degrees through the connecting part, after the two hoisting parts are connected through the connecting part, the hoisting parts can have the unfolded state and the folded state, the hoisting parts can be suitable for vertical hoisting after being folded, and the hoisting parts can be suitable for horizontal hoisting after being unfolded; in the hoisting process, the slings are connected to the connecting parts, the fabricated building is driven to ascend and descend through the connecting parts, vertical hoisting can be conducted in a folding mode when the fabricated building is hoisted in a vertical state, the hoisting process is more stable, a side-plate-shaped building can be conveniently built, and when the fabricated building is hoisted in a plane mode, the hoisting efficiency is improved. And the hoisting component can be unfolded for use, so that a roof-shaped building can be conveniently built.
本发明涉及装配式建筑技术领域,尤其是一种模块化建筑搭建方法及其装置,包括,设置一个能够转动一百八十度的连接部件;在该连接部件上设置两个相互抵触的吊装部件;两个相互抵触的吊装部件通过连接部件转动一百八十度后依旧能够相互抵触,本发明通过连接部件连接两个吊装部件后,吊装部件能够具备展开和折叠的两种状态,折叠后能够适用于竖直吊装,展开后能够适用于水平吊装,吊装过程中吊索连接在连接部件上,通过连接部件带动装配式建筑进行升降,在面对竖直状态的吊装时,可以采用折叠的方式进行竖直吊装,吊装过程更加平稳,便于对侧板形的建筑进行搭建,在面对平面吊装时,可以将吊装部件进行展开使用,便于对顶板形的建筑进行搭建。
Modularized building construction method and device
一种模块化建筑搭建方法及其装置
ZHANG JINDI (author) / WANG WENYE (author) / CUI LUN (author)
2024-04-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Modularized ice rink building device and construction method
European Patent Office | 2023
|Modularized assembly type building component and construction method
European Patent Office | 2022
|