A platform for research: civil engineering, architecture and urbanism
Construction method of sliding type prefabricated arched earthenware brick curtain wall
The invention relates to a construction method of a sliding type prefabricated arched earthenware brick curtain wall. The construction method comprises the following steps that arched keels are laid and welded; an arch-shaped supporting frame is laid and welded in the arch-shaped keel; earthenware brick units are laid between the arched keels and the arched supporting frames, the earthenware brick units are connected with the arched keels, and the arched keels, the arched supporting frames and the earthenware brick units jointly form a prefabricated arched earthenware brick curtain wall; after a preset time, the prefabricated arched earthenware brick curtain wall slides to a position to be installed, and a main keel in the arched keels is fixed; after the prefabricated arch-shaped earthenware brick curtain wall is stabilized, the arch-shaped supporting frame is withdrawn, and pointing is conducted on the arch bottom; on one hand, by arranging the arch-shaped supporting frame, the flatness of the earthenware brick units is guaranteed; and on the other hand, the sliding type prefabricated arched earthenware brick curtain wall is integrally prefabricated and then integrally installed, so that the construction efficiency is improved, and the construction period is shortened.
本发明涉及一种滑移式预制拱形陶砖幕墙的施工方法,包括以下步骤:铺设并焊接拱形龙骨;在所述拱形龙骨内部铺设并焊接拱形支撑架;在所述拱形龙骨与所述拱形支撑架之间铺设陶砖单元,其中,陶砖单元与所述拱形龙骨连接,所述拱形龙骨、所述拱形支撑架以及所述陶砖单元共同构成预制拱形陶砖幕墙;预设时间后,将所述预制拱形陶砖幕墙滑移至待安装位置,将所述拱形龙骨中的主龙骨固定;待所述预制拱形陶砖幕墙稳定后,将所述拱形支撑架撤离,进行拱底勾缝;一方面,通过设置拱形支撑架,保证了陶砖单元的平整度;另一方面,通过将滑移式预制拱形陶砖幕墙作为整体预制而后整体安装,提高了施工效率,缩短了施工工期。
Construction method of sliding type prefabricated arched earthenware brick curtain wall
The invention relates to a construction method of a sliding type prefabricated arched earthenware brick curtain wall. The construction method comprises the following steps that arched keels are laid and welded; an arch-shaped supporting frame is laid and welded in the arch-shaped keel; earthenware brick units are laid between the arched keels and the arched supporting frames, the earthenware brick units are connected with the arched keels, and the arched keels, the arched supporting frames and the earthenware brick units jointly form a prefabricated arched earthenware brick curtain wall; after a preset time, the prefabricated arched earthenware brick curtain wall slides to a position to be installed, and a main keel in the arched keels is fixed; after the prefabricated arch-shaped earthenware brick curtain wall is stabilized, the arch-shaped supporting frame is withdrawn, and pointing is conducted on the arch bottom; on one hand, by arranging the arch-shaped supporting frame, the flatness of the earthenware brick units is guaranteed; and on the other hand, the sliding type prefabricated arched earthenware brick curtain wall is integrally prefabricated and then integrally installed, so that the construction efficiency is improved, and the construction period is shortened.
本发明涉及一种滑移式预制拱形陶砖幕墙的施工方法,包括以下步骤:铺设并焊接拱形龙骨;在所述拱形龙骨内部铺设并焊接拱形支撑架;在所述拱形龙骨与所述拱形支撑架之间铺设陶砖单元,其中,陶砖单元与所述拱形龙骨连接,所述拱形龙骨、所述拱形支撑架以及所述陶砖单元共同构成预制拱形陶砖幕墙;预设时间后,将所述预制拱形陶砖幕墙滑移至待安装位置,将所述拱形龙骨中的主龙骨固定;待所述预制拱形陶砖幕墙稳定后,将所述拱形支撑架撤离,进行拱底勾缝;一方面,通过设置拱形支撑架,保证了陶砖单元的平整度;另一方面,通过将滑移式预制拱形陶砖幕墙作为整体预制而后整体安装,提高了施工效率,缩短了施工工期。
Construction method of sliding type prefabricated arched earthenware brick curtain wall
一种滑移式预制拱形陶砖幕墙的施工方法
LI PENG (author) / WANG FENG (author) / MIN TINGCHAO (author) / WANG YINGGE (author) / YANG LIU (author)
2024-04-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Earthenware brick curtain wall structure and earthenware brick curtain wall construction method
European Patent Office | 2023
|Movable earthenware brick and earthenware brick curtain wall
European Patent Office | 2024
|Hollow earthenware brick curtain wall structure and construction process
European Patent Office | 2022
|Unit type earthenware brick curtain wall system and installation method
European Patent Office | 2024
|Open type dry hanging earthenware brick curtain wall system and construction method thereof
European Patent Office | 2024
|