A platform for research: civil engineering, architecture and urbanism
Fabricated building structure and construction method thereof
The invention discloses a fabricated building structure and a construction method thereof, and relates to the technical field of fabricated buildings. The fabricated building structure comprises an independent base, and further comprises a height adjusting mechanism, the building framework is assembled, and the multiple first connecting bases, the multiple second connecting bases, the third connecting bases and the multiple cross beam supporting rods are matched with floors to form building floors; the connecting seat positioning structure comprises a first connecting seat, a second connecting seat and first positioning holes formed in the side supporting rods; by arranging the height adjusting mechanism, the height of the independent base can be adjusted so that the bottom of a building can be leveled, the steel framework structure of the building can be conveniently assembled and fixed by arranging the assembled building framework, the connecting base positioning structure and the supporting rod connecting positioning mechanism, and the fixing stability is high; disassembly and assembly are convenient and fast, and all parts can be repeatedly used.
本发明公开了一种装配式建筑结构及其施工方法,涉及装配式建筑技术领域。该装配式建筑结构,包括独立基座,还包括:高度调节机构;装配建筑骨架,且多个第一连接座、多个第二连接座、第三连接座和多个横梁支杆之间配合楼板组成建筑楼层;连接座定位结构,该定位结构包括第一连接座、第二连接座以及边侧支杆上均开设有的第一定位孔;本发明通过设置高度调节机构,能够对独立基座进行高度调节以便对建筑底部进行找平处理,而且通过设置装配建筑骨架、连接座定位结构和支杆连接定位机构,便于对建筑的钢骨架结构进行组装固定处理,而且固定的稳定性较高,拆装方便快捷,各部件可重复使用。
Fabricated building structure and construction method thereof
The invention discloses a fabricated building structure and a construction method thereof, and relates to the technical field of fabricated buildings. The fabricated building structure comprises an independent base, and further comprises a height adjusting mechanism, the building framework is assembled, and the multiple first connecting bases, the multiple second connecting bases, the third connecting bases and the multiple cross beam supporting rods are matched with floors to form building floors; the connecting seat positioning structure comprises a first connecting seat, a second connecting seat and first positioning holes formed in the side supporting rods; by arranging the height adjusting mechanism, the height of the independent base can be adjusted so that the bottom of a building can be leveled, the steel framework structure of the building can be conveniently assembled and fixed by arranging the assembled building framework, the connecting base positioning structure and the supporting rod connecting positioning mechanism, and the fixing stability is high; disassembly and assembly are convenient and fast, and all parts can be repeatedly used.
本发明公开了一种装配式建筑结构及其施工方法,涉及装配式建筑技术领域。该装配式建筑结构,包括独立基座,还包括:高度调节机构;装配建筑骨架,且多个第一连接座、多个第二连接座、第三连接座和多个横梁支杆之间配合楼板组成建筑楼层;连接座定位结构,该定位结构包括第一连接座、第二连接座以及边侧支杆上均开设有的第一定位孔;本发明通过设置高度调节机构,能够对独立基座进行高度调节以便对建筑底部进行找平处理,而且通过设置装配建筑骨架、连接座定位结构和支杆连接定位机构,便于对建筑的钢骨架结构进行组装固定处理,而且固定的稳定性较高,拆装方便快捷,各部件可重复使用。
Fabricated building structure and construction method thereof
一种装配式建筑结构及其施工方法
JI YANHAO (author) / XU FENG (author) / LIU CHUANXU (author) / WANG FANG (author) / LI XIPING (author) / NING GUODONG (author)
2024-04-12
Patent
Electronic Resource
Chinese
Fabricated building structure and construction method thereof
European Patent Office | 2023
|Fabricated building structure and construction method thereof
European Patent Office | 2022
|Fabricated building structure and construction method thereof
European Patent Office | 2021
|Fabricated building structure and construction method thereof
European Patent Office | 2020
|Fabricated building construction method and structure thereof
European Patent Office | 2023
|