Precast beam wet joint construction full-rotation moving device and using method
The invention belongs to the technical field of bridge precast beam construction, and particularly relates to a precast beam wet joint construction full-rotation moving device and a using method. According to the technical scheme, the full-rotation moving device for precast beam wet joint construction comprises a walking system arranged between two bridges, the two sides of the walking system are both arranged on precast beams, and a rotating system is installed on the walking system; the output end of the rotating system is provided with a construction operation platform used for assembling and disassembling a wet joint formwork and a pull rod. The invention provides a precast beam wet joint construction full-rotation moving device and a using method.
本发明属于桥梁预制梁施工技术领域,特别涉及一种预制梁湿接缝施工全回转移动装置和使用方法。其技术方案为:一种预制梁湿接缝施工全回转移动装置,包括设置于两幅桥梁之间的行走系统,行走系统的两侧均设置于预制梁上,行走系统上安装有旋转系统,旋转系统的输出端上安装有用于进行湿接缝模板及拉杆安拆作业的施工操作平台。本发明提供了一种预制梁湿接缝施工全回转移动装置和使用方法。
Precast beam wet joint construction full-rotation moving device and using method
The invention belongs to the technical field of bridge precast beam construction, and particularly relates to a precast beam wet joint construction full-rotation moving device and a using method. According to the technical scheme, the full-rotation moving device for precast beam wet joint construction comprises a walking system arranged between two bridges, the two sides of the walking system are both arranged on precast beams, and a rotating system is installed on the walking system; the output end of the rotating system is provided with a construction operation platform used for assembling and disassembling a wet joint formwork and a pull rod. The invention provides a precast beam wet joint construction full-rotation moving device and a using method.
本发明属于桥梁预制梁施工技术领域,特别涉及一种预制梁湿接缝施工全回转移动装置和使用方法。其技术方案为:一种预制梁湿接缝施工全回转移动装置,包括设置于两幅桥梁之间的行走系统,行走系统的两侧均设置于预制梁上,行走系统上安装有旋转系统,旋转系统的输出端上安装有用于进行湿接缝模板及拉杆安拆作业的施工操作平台。本发明提供了一种预制梁湿接缝施工全回转移动装置和使用方法。
Precast beam wet joint construction full-rotation moving device and using method
一种预制梁湿接缝施工全回转移动装置和使用方法
HUANG XIANG (author) / WANG CHENGLONG (author) / WANG LONGJUN (author) / WANG HUI (author) / WEI ZHANLI (author) / LI CHAO (author) / QIN BAITAO (author) / GAO ZHIYUAN (author)
2024-04-16
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Precast beam transverse moving device and construction method
European Patent Office | 2023
|European Patent Office | 2024
|