A platform for research: civil engineering, architecture and urbanism
Road water seepage blind ditch
The invention discloses a road water seepage blind ditch, and relates to the field of road drainage, the road water seepage blind ditch comprises an excavated earth ditch, a plurality of permeable pipes are placed in the excavated earth ditch, a fixed compression-resistant mechanism is arranged between adjacent permeable pipes, an auxiliary reinforcing mechanism is arranged on the fixed compression-resistant mechanism, the excavated earth ditch is filled with a stone layer, and a backfill soil layer is laid on the stone layer. The two permeable pipes are fixed together through the fixed compression-resistant mechanism, the permeable pipes are buried in the stone layer, then the stone layer is filled with backfill soil to form the backfill soil layer, and under the supporting of the fixed compression-resistant mechanism, the connecting position of the two adjacent permeable pipes is supported. And meanwhile, the auxiliary reinforcing mechanism further fixes the water permeable pipes fixed to the fixed pressure-resistant mechanism, so that connection between the two water permeable pipes is more stable, and the possibility that the two water permeable pipes are extruded to deviate is reduced.
本申请公开了一种道路渗水盲沟,涉及道路排水领域,包括开挖土沟,开挖土沟内放置有若干个透水管,相邻透水管之间设置有固定抗压机构,固定抗压机构上设置有辅助加固机构,开挖土沟内填充有石子层,石子层上铺设有回填土层。利用固定抗压机构将两个透水管固定起来,将透水管埋在石子层内,然后在石子层上填埋上回填土形成回填土层,在固定抗压机构的支撑下,让两个相邻的透水管的连接处被支撑,同时辅助加固机构对固定在固定抗压机构上的透水管进一步地的固定,从而能够让两个透水管之间的连接更加的稳定,减少两个透水管之间受到挤压偏移的可能。
Road water seepage blind ditch
The invention discloses a road water seepage blind ditch, and relates to the field of road drainage, the road water seepage blind ditch comprises an excavated earth ditch, a plurality of permeable pipes are placed in the excavated earth ditch, a fixed compression-resistant mechanism is arranged between adjacent permeable pipes, an auxiliary reinforcing mechanism is arranged on the fixed compression-resistant mechanism, the excavated earth ditch is filled with a stone layer, and a backfill soil layer is laid on the stone layer. The two permeable pipes are fixed together through the fixed compression-resistant mechanism, the permeable pipes are buried in the stone layer, then the stone layer is filled with backfill soil to form the backfill soil layer, and under the supporting of the fixed compression-resistant mechanism, the connecting position of the two adjacent permeable pipes is supported. And meanwhile, the auxiliary reinforcing mechanism further fixes the water permeable pipes fixed to the fixed pressure-resistant mechanism, so that connection between the two water permeable pipes is more stable, and the possibility that the two water permeable pipes are extruded to deviate is reduced.
本申请公开了一种道路渗水盲沟,涉及道路排水领域,包括开挖土沟,开挖土沟内放置有若干个透水管,相邻透水管之间设置有固定抗压机构,固定抗压机构上设置有辅助加固机构,开挖土沟内填充有石子层,石子层上铺设有回填土层。利用固定抗压机构将两个透水管固定起来,将透水管埋在石子层内,然后在石子层上填埋上回填土形成回填土层,在固定抗压机构的支撑下,让两个相邻的透水管的连接处被支撑,同时辅助加固机构对固定在固定抗压机构上的透水管进一步地的固定,从而能够让两个透水管之间的连接更加的稳定,减少两个透水管之间受到挤压偏移的可能。
Road water seepage blind ditch
一种道路渗水盲沟
SU YUZE (author) / OUYANG ZHONGQIANG (author) / LI LING (author) / DING WENJIE (author) / WANG DINGKAI (author) / JIAN FENGMEI (author)
2024-04-16
Patent
Electronic Resource
Chinese
Efficient and safe seepage interception blind ditch construction method
European Patent Office | 2024
|Blind ditch exhaust optimization method for reservoir geomembrane seepage prevention
European Patent Office | 2022
|Unsteady Seepage toward Narrow Ditch
ASCE | 2021
|