Construction method of GRG integrated ceiling assembly type module system
The invention relates to a construction method of a GRG integrated ceiling fabricated module system, which comprises the following steps: S1, modularizing plates; S2, carrying out construction lofting: releasing a measurement control network according to an engineering main shaft control line, and lofting the plane position and elevation of a GRG three-dimensional BIM model into a building; s3, a base layer steel frame and a secondary transfer layer steel frame are assembled, specifically, the base layer steel frame is assembled and fixedly connected with the building truss, and the secondary transfer layer steel frame is assembled according to the lofting result and hoisted to the base layer steel frame; s4, coating is conducted, specifically, paint treatment is conducted on the basic module; and S5, the GRG integrated suspended ceiling is assembled, specifically, the basic module, the functional module and the multiple auxiliary modules are spliced and fixed into GRG suspended ceiling plates, the multiple GRG suspended ceiling plates are assembled and spliced into the GRG integrated suspended ceiling, and finally the GRG integrated suspended ceiling is hoisted to the secondary conversion layer steel frame through hoisting equipment. The construction method has the effect of reducing manpower and time consumed by construction.
本申请涉及一种GRG集成吊顶装配式模块体系的施工方法,其包括如下步骤:S1,板块模块化:S2,施工放样:根据工程主轴控制线放出测量控制网,将GRG三维BIM模型的平面位置和高程放样至建筑物内;S3,组装基层钢架和二次转换层钢架:组装基层钢架并将基层钢架与建筑桁架固定连接,根据放样结果组装二次转换层钢架并将二次转换层钢架吊装至基层钢架;S4,涂装:在基础模块上进行油漆处理;S5,组装GRG集成吊顶:将基础模块、功能模块和多个辅助模块拼接固定成GRG吊顶板块,并将多个GRG吊顶板块组装拼接成GRG集成吊顶,最后利用吊装设备将GRG集成吊顶吊装至二次转换层钢架。本申请具有减少施工所需要耗费的人力和时间的效果。
Construction method of GRG integrated ceiling assembly type module system
The invention relates to a construction method of a GRG integrated ceiling fabricated module system, which comprises the following steps: S1, modularizing plates; S2, carrying out construction lofting: releasing a measurement control network according to an engineering main shaft control line, and lofting the plane position and elevation of a GRG three-dimensional BIM model into a building; s3, a base layer steel frame and a secondary transfer layer steel frame are assembled, specifically, the base layer steel frame is assembled and fixedly connected with the building truss, and the secondary transfer layer steel frame is assembled according to the lofting result and hoisted to the base layer steel frame; s4, coating is conducted, specifically, paint treatment is conducted on the basic module; and S5, the GRG integrated suspended ceiling is assembled, specifically, the basic module, the functional module and the multiple auxiliary modules are spliced and fixed into GRG suspended ceiling plates, the multiple GRG suspended ceiling plates are assembled and spliced into the GRG integrated suspended ceiling, and finally the GRG integrated suspended ceiling is hoisted to the secondary conversion layer steel frame through hoisting equipment. The construction method has the effect of reducing manpower and time consumed by construction.
本申请涉及一种GRG集成吊顶装配式模块体系的施工方法,其包括如下步骤:S1,板块模块化:S2,施工放样:根据工程主轴控制线放出测量控制网,将GRG三维BIM模型的平面位置和高程放样至建筑物内;S3,组装基层钢架和二次转换层钢架:组装基层钢架并将基层钢架与建筑桁架固定连接,根据放样结果组装二次转换层钢架并将二次转换层钢架吊装至基层钢架;S4,涂装:在基础模块上进行油漆处理;S5,组装GRG集成吊顶:将基础模块、功能模块和多个辅助模块拼接固定成GRG吊顶板块,并将多个GRG吊顶板块组装拼接成GRG集成吊顶,最后利用吊装设备将GRG集成吊顶吊装至二次转换层钢架。本申请具有减少施工所需要耗费的人力和时间的效果。
Construction method of GRG integrated ceiling assembly type module system
一种GRG集成吊顶装配式模块体系的施工方法
XU JINYUAN (author) / ZHOU SHENBIN (author) / MA WEI (author) / LYU SIHANG (author) / WANG KAILI (author)
2024-04-16
Patent
Electronic Resource
Chinese
MODULE TYPE CEILING SYSTEM AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2023
MODULE TYPE CEILING SYSTEM AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2023
|MODULE TYPE CEILING SYSTEM AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2022
|GRG integrated assembly type suspended ceiling and construction method thereof
European Patent Office | 2023
|SYSTEM CEILING OF MODULE TYPE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2017
|