A platform for research: civil engineering, architecture and urbanism
Integrated adjustable formwork suitable for flow-state solidified soil backfilling and construction method
The invention relates to the technical field of building construction, and particularly discloses an integrated adjustable formwork suitable for flow-state solidified soil backfilling and a construction method. Comprising a supporting plate installed on a base layer, a soil retaining formwork assembly hinged to the supporting plate and used for supporting flow-state solidified soil, and a supporting adjusting assembly with one end hinged to the supporting plate and the other end hinged to the side, away from the flow-state solidified soil, of a soil retaining plate assembly. The friction assembly is installed on the supporting plate and used for increasing the friction force between the supporting plate and the base layer part. According to the construction method, pouring construction of the flow-state solidified soil can be effectively conducted, large-area assembly does not need to be conducted on the construction site, meanwhile, due to the fact that the main formwork and the supporting plate are hinged, the angle between the main formwork and the supporting plate can be adjusted according to needs in the using process, and the construction efficiency is improved. And therefore, different use requirements are met.
本发明涉及建筑施工技术领域,具体公开了一种适用于流态固化土回填的一体化可调模板及施工方法,包括安装在基层上的支撑板、与支撑板铰接且用于对流态固化土支撑的挡土模板组件、一端支撑板铰接且另外一端与挡土板组件远离流态固化土一侧铰接的支撑调节组件、以及安装在支撑板上且用于增大支撑板与基层件摩擦力的摩擦组件。以及公开了一种适用于流态固化土回填的施工方法,本发明能够有效的流态固化土的浇筑施工,不需要在施工现场进行大面积组装,同时由于主模板与支撑板为铰接,使用时,能够根据需要调整主模板与支撑板之间的角度,进而适应不同的使用需求。
Integrated adjustable formwork suitable for flow-state solidified soil backfilling and construction method
The invention relates to the technical field of building construction, and particularly discloses an integrated adjustable formwork suitable for flow-state solidified soil backfilling and a construction method. Comprising a supporting plate installed on a base layer, a soil retaining formwork assembly hinged to the supporting plate and used for supporting flow-state solidified soil, and a supporting adjusting assembly with one end hinged to the supporting plate and the other end hinged to the side, away from the flow-state solidified soil, of a soil retaining plate assembly. The friction assembly is installed on the supporting plate and used for increasing the friction force between the supporting plate and the base layer part. According to the construction method, pouring construction of the flow-state solidified soil can be effectively conducted, large-area assembly does not need to be conducted on the construction site, meanwhile, due to the fact that the main formwork and the supporting plate are hinged, the angle between the main formwork and the supporting plate can be adjusted according to needs in the using process, and the construction efficiency is improved. And therefore, different use requirements are met.
本发明涉及建筑施工技术领域,具体公开了一种适用于流态固化土回填的一体化可调模板及施工方法,包括安装在基层上的支撑板、与支撑板铰接且用于对流态固化土支撑的挡土模板组件、一端支撑板铰接且另外一端与挡土板组件远离流态固化土一侧铰接的支撑调节组件、以及安装在支撑板上且用于增大支撑板与基层件摩擦力的摩擦组件。以及公开了一种适用于流态固化土回填的施工方法,本发明能够有效的流态固化土的浇筑施工,不需要在施工现场进行大面积组装,同时由于主模板与支撑板为铰接,使用时,能够根据需要调整主模板与支撑板之间的角度,进而适应不同的使用需求。
Integrated adjustable formwork suitable for flow-state solidified soil backfilling and construction method
一种适用于流态固化土回填的一体化可调模板及施工方法
WANG QINGFENG (author) / ZHAO YINMING (author) / HOU CHAOSEN (author) / LI RUISONG (author) / ZHAN BIN (author) / YAO BO (author)
2024-04-19
Patent
Electronic Resource
Chinese
Flow-state solidified soil replacement backfilling method
European Patent Office | 2023
|European Patent Office | 2023
|Foundation trench backfilling construction method based on premixed flow state solidified soil
European Patent Office | 2023
|Karst cave pouring and backfilling construction method for flow-state solidified soil
European Patent Office | 2024
|Device and method for backfilling flow-state solidified soil in narrow and high backfilling area
European Patent Office | 2022
|