A platform for research: civil engineering, architecture and urbanism
Building construction concrete coating maintenance device
The invention relates to a building construction concrete laminating curing device, and belongs to the technical field of building construction. The device comprises a base, a vertical column, a suspension rod and a film cylinder, a film used for film covering maintenance is wound on the film cylinder, the vertical column is installed on the base and is vertically arranged, the suspension rod is installed on the vertical column in a horizontal overhanging mode, and the suspension rod is installed on the vertical column in an axial sliding mode. The film cylinder is rotationally installed at the overhanging end of the suspension rod, the base comprises a fixed base and a lifting base, a lifting structure is arranged between the lifting base and the fixed base, and the distance between the suspension rod and the lifting base is kept fixed and ranges from 1 m to 1.5 m. The method has the effects that the film covering process is more convenient, and the concrete surface layer is not prone to being damaged.
本申请涉及一种建筑施工混凝土覆膜养护装置,属于建筑施工技术领域。其包括底座、竖直柱、悬空杆和膜筒,所述膜筒上缠绕用于覆膜养护的膜,所述竖直柱安装于所述底座上且竖向设置,所述悬空杆水平悬伸安装于所述竖直柱上,所述悬空杆轴向滑移安装于所述竖直柱上,所述膜筒转动安装于所述悬空杆悬伸的一端,所述底座包括固定座和上升座,所述上升座与所述固定座之间设置有抬升结构,所述悬空杆与所述上升座之间间距保持固定且间距为1米‑1.5米。本申请具有覆膜过程更方便且不易损伤混凝土表层的效果。
Building construction concrete coating maintenance device
The invention relates to a building construction concrete laminating curing device, and belongs to the technical field of building construction. The device comprises a base, a vertical column, a suspension rod and a film cylinder, a film used for film covering maintenance is wound on the film cylinder, the vertical column is installed on the base and is vertically arranged, the suspension rod is installed on the vertical column in a horizontal overhanging mode, and the suspension rod is installed on the vertical column in an axial sliding mode. The film cylinder is rotationally installed at the overhanging end of the suspension rod, the base comprises a fixed base and a lifting base, a lifting structure is arranged between the lifting base and the fixed base, and the distance between the suspension rod and the lifting base is kept fixed and ranges from 1 m to 1.5 m. The method has the effects that the film covering process is more convenient, and the concrete surface layer is not prone to being damaged.
本申请涉及一种建筑施工混凝土覆膜养护装置,属于建筑施工技术领域。其包括底座、竖直柱、悬空杆和膜筒,所述膜筒上缠绕用于覆膜养护的膜,所述竖直柱安装于所述底座上且竖向设置,所述悬空杆水平悬伸安装于所述竖直柱上,所述悬空杆轴向滑移安装于所述竖直柱上,所述膜筒转动安装于所述悬空杆悬伸的一端,所述底座包括固定座和上升座,所述上升座与所述固定座之间设置有抬升结构,所述悬空杆与所述上升座之间间距保持固定且间距为1米‑1.5米。本申请具有覆膜过程更方便且不易损伤混凝土表层的效果。
Building construction concrete coating maintenance device
一种建筑施工混凝土覆膜养护装置
CHEN QIANG (author) / HU CHENHUI (author) / DU KAIHAO (author) / LIU SHUJING (author)
2024-04-19
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building construction concrete coating maintenance device
European Patent Office | 2023
|