A platform for research: civil engineering, architecture and urbanism
Simple canal for karst rocky desertification region
The simple canal for the karst rocky desertification region comprises first groove-shaped structural parts and second groove-shaped structural parts, the first groove-shaped structural parts are located under the second groove-shaped structural parts and connected through first bolts, and the multiple second groove-shaped structural parts are movably connected through supporting parts and connecting parts. A pressing strip is movably connected to the upper portion of the connecting piece, a polyethylene film is attached to the inner side of the second groove-shaped structural piece, and the two sides of the polyethylene film are located between the pressing strip and the connecting piece to be fixed. The work of a welding part of the structure is completed in a factory, structural parts are simple, all parts only need to be assembled and connected through bolts on site, the construction workload is greatly reduced at present, damage to the environment is reduced to the minimum, the cost of the structure is reduced, and when the structure does not need to be used any more, the structure can be disassembled and transported to other places to be repeatedly used, so that the construction cost is reduced. And a good use effect is achieved.
本发明公开了一种用于喀斯特石漠化地区的简易水渠,它包括槽形结构件一和槽形结构件二,所述槽形结构件一位于槽形结构件二正下方且通过螺栓一连接,若干组槽形结构件二之间通过支撑件和连接件活动连接,在连接件上方活动连接有压条,在槽形结构件二内侧贴有聚乙烯膜,所述聚乙烯膜的两侧位于所述压条和连接件之间固定。该结构的焊接部分工作在工厂内完成,结构件简单,在现场只需要用螺栓将各部件组装连接即可,现在施工工作量大大减少,对环境的破坏也降到了最低,本结构成本得到了下降,当不再需要使用时,还可以拆卸下来再运到别处重复使用,取得了很好的使用效果。
Simple canal for karst rocky desertification region
The simple canal for the karst rocky desertification region comprises first groove-shaped structural parts and second groove-shaped structural parts, the first groove-shaped structural parts are located under the second groove-shaped structural parts and connected through first bolts, and the multiple second groove-shaped structural parts are movably connected through supporting parts and connecting parts. A pressing strip is movably connected to the upper portion of the connecting piece, a polyethylene film is attached to the inner side of the second groove-shaped structural piece, and the two sides of the polyethylene film are located between the pressing strip and the connecting piece to be fixed. The work of a welding part of the structure is completed in a factory, structural parts are simple, all parts only need to be assembled and connected through bolts on site, the construction workload is greatly reduced at present, damage to the environment is reduced to the minimum, the cost of the structure is reduced, and when the structure does not need to be used any more, the structure can be disassembled and transported to other places to be repeatedly used, so that the construction cost is reduced. And a good use effect is achieved.
本发明公开了一种用于喀斯特石漠化地区的简易水渠,它包括槽形结构件一和槽形结构件二,所述槽形结构件一位于槽形结构件二正下方且通过螺栓一连接,若干组槽形结构件二之间通过支撑件和连接件活动连接,在连接件上方活动连接有压条,在槽形结构件二内侧贴有聚乙烯膜,所述聚乙烯膜的两侧位于所述压条和连接件之间固定。该结构的焊接部分工作在工厂内完成,结构件简单,在现场只需要用螺栓将各部件组装连接即可,现在施工工作量大大减少,对环境的破坏也降到了最低,本结构成本得到了下降,当不再需要使用时,还可以拆卸下来再运到别处重复使用,取得了很好的使用效果。
Simple canal for karst rocky desertification region
一种用于喀斯特石漠化地区的简易水渠
YUE KUNQIAN (author) / LAN JIACHENG (author) / HUANG MINGZHI (author) / LIU LEI (author) / ZHANG XIANWEN (author) / MAO RUITAO (author)
2024-04-26
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Comprehensive treatment method for rocky desertification land in karst area
European Patent Office | 2021
|Soil Quality Assessment and Management in Karst Rocky Desertification Ecosystem of Southwest China
DOAJ | 2022
|European Patent Office | 2023
|