A platform for research: civil engineering, architecture and urbanism
Iron tower transportation and installation equipment and installation method
The invention discloses iron tower transportation and installation equipment and an installation method, the installation equipment comprises a transportation vehicle body, the transportation vehicle body moves towards an iron tower base along a rail, and the transportation vehicle body is provided with a through opening for an iron tower body to penetrate through and be in butt joint with the iron tower base; the iron tower adjusting assembly is arranged on the transport vehicle body and used for adjusting the position and angle of the iron tower body; and the iron tower mounting piece is arranged at the bottom of the iron tower body and connected with the iron tower adjusting assembly, and the iron tower mounting piece is driven by the iron tower adjusting assembly to be in butt joint with the iron tower base. The iron tower main body is assembled and then subjected to power failure and wire falling, then the iron tower main body can be integrally transported to the iron tower mounting foundation to replace the iron tower of the existing line, the construction period is greatly shortened, and the power failure time is short.
本发明公开了一种铁塔运输安装设备以及安装方法,该安装设备包括:运输车体,所述运输车体沿着轨道向铁塔基座移动,所述运输车体上设有供铁塔主体穿过与铁塔基座对接的通口;铁塔调整组件,设于运输车体上,用于调整铁塔主体的位置和角度;以及,铁塔安装件,设于铁塔主体底部且与铁塔调整组件连接,所述铁塔安装件由铁塔调整组件驱使与铁塔基座对接。通过在本发明上将铁塔主体组装后再停电落线,随后本发明可将铁塔主体整体运输至铁塔安装基础处更换既有线路的铁塔,大大缩短了工期,且停电时间短。
Iron tower transportation and installation equipment and installation method
The invention discloses iron tower transportation and installation equipment and an installation method, the installation equipment comprises a transportation vehicle body, the transportation vehicle body moves towards an iron tower base along a rail, and the transportation vehicle body is provided with a through opening for an iron tower body to penetrate through and be in butt joint with the iron tower base; the iron tower adjusting assembly is arranged on the transport vehicle body and used for adjusting the position and angle of the iron tower body; and the iron tower mounting piece is arranged at the bottom of the iron tower body and connected with the iron tower adjusting assembly, and the iron tower mounting piece is driven by the iron tower adjusting assembly to be in butt joint with the iron tower base. The iron tower main body is assembled and then subjected to power failure and wire falling, then the iron tower main body can be integrally transported to the iron tower mounting foundation to replace the iron tower of the existing line, the construction period is greatly shortened, and the power failure time is short.
本发明公开了一种铁塔运输安装设备以及安装方法,该安装设备包括:运输车体,所述运输车体沿着轨道向铁塔基座移动,所述运输车体上设有供铁塔主体穿过与铁塔基座对接的通口;铁塔调整组件,设于运输车体上,用于调整铁塔主体的位置和角度;以及,铁塔安装件,设于铁塔主体底部且与铁塔调整组件连接,所述铁塔安装件由铁塔调整组件驱使与铁塔基座对接。通过在本发明上将铁塔主体组装后再停电落线,随后本发明可将铁塔主体整体运输至铁塔安装基础处更换既有线路的铁塔,大大缩短了工期,且停电时间短。
Iron tower transportation and installation equipment and installation method
一种铁塔运输安装设备以及安装方法
ZHENG HANGRONG (author) / WANG JIAN (author)
2024-04-26
Patent
Electronic Resource
Chinese
Tower internal part installation auxiliary equipment and installation method
European Patent Office | 2024
|Hoisting equipment for electric power iron tower installation
European Patent Office | 2024
|Steel member conveying equipment for iron tower installation
European Patent Office | 2024
|Installation equipment and installation method of electric power sharing tower
European Patent Office | 2022
|