Bridge vase pier steel formwork fixing construction method
The invention discloses a bridge vase pier steel formwork fixing construction method, and belongs to the technical field of road bridge engineering construction. The problems that in the prior art, a bridge vase pier needs to be perforated many times in the early stage, holes need to be blocked in the later stage, construction procedures are many, and efficiency is low are solved. Comprising the following steps: assembling a vase pier mold by using a steel template provided with a back ridge; reinforcing the vase pier mold by adopting a mode that the back ridge is matched with a fastening bolt; falling into a reinforcement cage; pouring mixed mortar; the bridge vase pier steel formwork fixing construction method is used for bridge vase pier construction, perforation fixing is not needed in the construction process, environment friendliness is achieved, the number of construction procedures is small, the construction period is short, the construction cost is low, and the bridge vase pier steel formwork is easy and convenient to install and fix, safe, reliable and flexible and convenient to install and disassemble.
本发明公开了一种桥梁花瓶墩钢模板固定施工方法,属于道路桥梁工程施工技术领域。解决了现有技术中存在的桥梁花瓶墩前期需要进行多次穿孔,后期需要对孔封堵,施工工序多、效率低的问题。包括以下步骤:将设置有背楞的钢模板组装花瓶墩模‑采用背楞配合紧固螺栓的方式对花瓶墩模加固‑掉入钢筋笼‑浇筑混合砂浆‑拆除钢模板。本申请的桥梁花瓶墩钢模板固定施工方法用于桥梁花瓶墩施工,施工过程中无需穿孔固定,环保、施工工序少、施工工期短、施工成本低,桥梁花瓶墩钢模板安装固定简单方便,安全可靠、安装拆卸灵活方便。
Bridge vase pier steel formwork fixing construction method
The invention discloses a bridge vase pier steel formwork fixing construction method, and belongs to the technical field of road bridge engineering construction. The problems that in the prior art, a bridge vase pier needs to be perforated many times in the early stage, holes need to be blocked in the later stage, construction procedures are many, and efficiency is low are solved. Comprising the following steps: assembling a vase pier mold by using a steel template provided with a back ridge; reinforcing the vase pier mold by adopting a mode that the back ridge is matched with a fastening bolt; falling into a reinforcement cage; pouring mixed mortar; the bridge vase pier steel formwork fixing construction method is used for bridge vase pier construction, perforation fixing is not needed in the construction process, environment friendliness is achieved, the number of construction procedures is small, the construction period is short, the construction cost is low, and the bridge vase pier steel formwork is easy and convenient to install and fix, safe, reliable and flexible and convenient to install and disassemble.
本发明公开了一种桥梁花瓶墩钢模板固定施工方法,属于道路桥梁工程施工技术领域。解决了现有技术中存在的桥梁花瓶墩前期需要进行多次穿孔,后期需要对孔封堵,施工工序多、效率低的问题。包括以下步骤:将设置有背楞的钢模板组装花瓶墩模‑采用背楞配合紧固螺栓的方式对花瓶墩模加固‑掉入钢筋笼‑浇筑混合砂浆‑拆除钢模板。本申请的桥梁花瓶墩钢模板固定施工方法用于桥梁花瓶墩施工,施工过程中无需穿孔固定,环保、施工工序少、施工工期短、施工成本低,桥梁花瓶墩钢模板安装固定简单方便,安全可靠、安装拆卸灵活方便。
Bridge vase pier steel formwork fixing construction method
一种桥梁花瓶墩钢模板固定施工方法
ZHU SHIWEN (author) / WANG CHAOHUI (author) / JIA LIANG (author) / LI SHUO (author) / OH KYOUNG-IL (author)
2024-05-03
Patent
Electronic Resource
Chinese
Bridge pier pouring steel formwork reinforcing device for bridge construction
European Patent Office | 2024
|Bridge pier pouring steel formwork reinforcing structure for bridge construction
European Patent Office | 2023
|Bridge pier pouring steel formwork reinforcing structure for bridge construction
European Patent Office | 2024
|Formwork and construction method for bridge formwork turnover pier column construction
European Patent Office | 2023
|