Auxiliary construction method for steel platform of deep foundation pit near river
The invention provides a riverside deep foundation pit steel platform auxiliary construction method, and relates to the field of hydraulic engineering pump gate construction. Comprising the steps of deep foundation pit excavation, supporting and dewatering and drainage; the steel platform structure is arranged on the edge of the deep foundation pit, and the top face of the steel platform structure is consistent with the ground elevation of the two sides of the foundation pit; steel platform structure auxiliary construction is conducted, specifically, through assistance of a steel platform structure, a building in the deep foundation pit is constructed; and the steel platform structure is dismantled, and when building construction in the deep foundation pit reaches a set stage, the steel platform structure is dismantled in order. The method has the beneficial effects that the problems that a foundation pit operation site is narrow, temporary building station arrangement is seriously limited, foundation pit ramp arrangement is limited, and conveying of materials and materials around and in a foundation pit is limited are solved, the space of the foundation pit slope face is fully used, and conflicts with the construction face of a structure in the foundation pit are avoided.
本发明提供了一种临江深基坑钢平台辅助施工方法,涉及水利工程泵闸施工领域。包括:深基坑开挖、支护及降排水;钢平台结构布置,所述钢平台结构在深基坑边缘设置,所述钢平台结构顶面与基坑两侧地面高程一致;钢平台结构辅助施工,通过所述钢平台结构的辅助,对所述深基坑内建筑物进行施工;钢平台结构拆除,当所述深基坑内建筑物施工进行到既定阶段,将所述钢平台结构有序拆除。本发明有益效果:解决了基坑作业场地狭小、临建场站布置严重受限,基坑坡道布置受限,基坑周边及基坑内物资、材料输送受限等问题,既充分使用了基坑斜坡面空间,又避免与基坑内结构物施工面相冲突。
Auxiliary construction method for steel platform of deep foundation pit near river
The invention provides a riverside deep foundation pit steel platform auxiliary construction method, and relates to the field of hydraulic engineering pump gate construction. Comprising the steps of deep foundation pit excavation, supporting and dewatering and drainage; the steel platform structure is arranged on the edge of the deep foundation pit, and the top face of the steel platform structure is consistent with the ground elevation of the two sides of the foundation pit; steel platform structure auxiliary construction is conducted, specifically, through assistance of a steel platform structure, a building in the deep foundation pit is constructed; and the steel platform structure is dismantled, and when building construction in the deep foundation pit reaches a set stage, the steel platform structure is dismantled in order. The method has the beneficial effects that the problems that a foundation pit operation site is narrow, temporary building station arrangement is seriously limited, foundation pit ramp arrangement is limited, and conveying of materials and materials around and in a foundation pit is limited are solved, the space of the foundation pit slope face is fully used, and conflicts with the construction face of a structure in the foundation pit are avoided.
本发明提供了一种临江深基坑钢平台辅助施工方法,涉及水利工程泵闸施工领域。包括:深基坑开挖、支护及降排水;钢平台结构布置,所述钢平台结构在深基坑边缘设置,所述钢平台结构顶面与基坑两侧地面高程一致;钢平台结构辅助施工,通过所述钢平台结构的辅助,对所述深基坑内建筑物进行施工;钢平台结构拆除,当所述深基坑内建筑物施工进行到既定阶段,将所述钢平台结构有序拆除。本发明有益效果:解决了基坑作业场地狭小、临建场站布置严重受限,基坑坡道布置受限,基坑周边及基坑内物资、材料输送受限等问题,既充分使用了基坑斜坡面空间,又避免与基坑内结构物施工面相冲突。
Auxiliary construction method for steel platform of deep foundation pit near river
一种临江深基坑钢平台辅助施工方法
LI JING (author) / YU XIAOWEI (author) / NIE JINLONG (author) / LI LUJUN (author) / WANG ERJUN (author) / YANG TAO (author) / JIANG FUWEI (author) / MA JUNJIE (author) / LIU YIGUANG (author) / AN YONGSHUAI (author)
2024-05-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|European Patent Office | 2023
|Deep foundation clearing construction method for deep foundation pit near subway
European Patent Office | 2021
|European Patent Office | 2021
|