The invention relates to the technical field of formwork turnover, in particular to a civil engineering formwork turnover process which comprises the following steps that a formwork is installed; pouring concrete; mounting an outer frame; dismounting, lifting and mounting a lower layer template; the outer support is lifted; supporting an inner template and a lower-layer template on the top of a bearing platform, and supporting an upper-layer template on the lower-layer template and connecting the upper-layer template with the lower-layer template; a fixing support system is used as a support, the inner formwork, the lower formwork and the upper formwork are fixed to the fixing support system, and the inner formwork, the lower formwork and the upper formwork define a pouring cavity. According to the civil engineering formwork turnover process, the formwork input amount is small, and the utilization rate is high. The inner formwork, the first formwork and the second formwork are fixed through the fixing support system, a pull rod is not needed, and the fixing effect is good.
本发明涉及翻模技术领域,具体为一种土建翻模工艺,包括以下步骤:模板安装;浇筑混凝土;外框架安装;下层模板的拆除、提升、安装;对外支架进行提升;将内模板和下层模板支承于承台顶上,将上层模板支承于所述下层模板上并与所述下层模板连接;利用固定支架系统作为支撑,将所述内模板、所述下层模板及所述上层模板固定于所述固定支架系统,所述内模板与所述下层模板、所述上层模板围合形成浇筑腔。该一种土建翻模工艺,模板投入量少,利用率较高。内模板、第一模板和第二模板采用固定支架系统进行固定,无需拉杆,固定作用较好。
Civil engineering mold turnover process
The invention relates to the technical field of formwork turnover, in particular to a civil engineering formwork turnover process which comprises the following steps that a formwork is installed; pouring concrete; mounting an outer frame; dismounting, lifting and mounting a lower layer template; the outer support is lifted; supporting an inner template and a lower-layer template on the top of a bearing platform, and supporting an upper-layer template on the lower-layer template and connecting the upper-layer template with the lower-layer template; a fixing support system is used as a support, the inner formwork, the lower formwork and the upper formwork are fixed to the fixing support system, and the inner formwork, the lower formwork and the upper formwork define a pouring cavity. According to the civil engineering formwork turnover process, the formwork input amount is small, and the utilization rate is high. The inner formwork, the first formwork and the second formwork are fixed through the fixing support system, a pull rod is not needed, and the fixing effect is good.
本发明涉及翻模技术领域,具体为一种土建翻模工艺,包括以下步骤:模板安装;浇筑混凝土;外框架安装;下层模板的拆除、提升、安装;对外支架进行提升;将内模板和下层模板支承于承台顶上,将上层模板支承于所述下层模板上并与所述下层模板连接;利用固定支架系统作为支撑,将所述内模板、所述下层模板及所述上层模板固定于所述固定支架系统,所述内模板与所述下层模板、所述上层模板围合形成浇筑腔。该一种土建翻模工艺,模板投入量少,利用率较高。内模板、第一模板和第二模板采用固定支架系统进行固定,无需拉杆,固定作用较好。
Civil engineering mold turnover process
一种土建翻模工艺
ZHA LI (author) / ZHANG JIAHUI (author)
2024-05-10
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Civil engineering base mold fixing clamp convenient to disassemble
European Patent Office | 2021
|Process Modelling in Civil Engineering
Online Contents | 2009
|