Retaining wall building equipment and retaining wall construction method
The invention discloses retaining wall building equipment and a retaining wall construction method, and relates to a building construction technology. Comprising the steps of retaining wall anti-slide pile construction, anti-slide pile crown beam construction embedded part pre-embedding, retaining wall earth excavation inter-pile soil cleaning, retaining wall construction equipment installation operation, circular construction of retaining wall inter-pile plate vertical first mold construction to Nth mold construction, retaining wall construction equipment horizontal movement to a next retaining wall construction section, and repeating the operation of the sixth step to the eighth step until construction is completed. And the retaining wall building equipment is dismantled, and the building construction operation of the retaining wall is completed. The retaining wall building equipment replaces traditional construction of the retaining wall inter-pile plates through a wood mold and a steel pipe operation frame, safety is good, construction quality is good, the number of times of formwork turnover is high, loss is small, turnover circulation can be achieved rapidly, the modulus is adjustable, certain adaptability is achieved, plant formwork construction labor input is reduced, the construction cost of the retaining wall inter-pile plates is reduced, the construction period is shortened, and the construction efficiency is improved. And the industrial construction level of the retaining wall inter-pile plate is improved.
本发明公开了一种基于挡墙建造设备及挡墙施工方法,涉及建筑施工技术,包括挡墙抗滑桩施工、抗滑桩冠梁施工预埋件预埋、挡墙土方开挖桩间土清理、挡墙建造装备安装作业、挡墙桩间板竖向第一模施工至第N模的循环施工、挡墙建造装备水平移动至下一挡墙施工段、重复上述步骤六至骤八的操作直至施工完成、拆除挡墙建造装备总计九个操作步骤,完成挡墙的建造施工作业。本发明通过挡墙建造装备代替传统木模加钢管操作架挡墙桩间板施工,安全性好、施工质量好、模板周转次数高损耗少,可快速周转循环,模数可调,具有一定适应性的,减少厂房模架施工人工投入,节约挡墙桩间板施工成本及施工周期,提高挡墙桩间板工业化建造水平。
Retaining wall building equipment and retaining wall construction method
The invention discloses retaining wall building equipment and a retaining wall construction method, and relates to a building construction technology. Comprising the steps of retaining wall anti-slide pile construction, anti-slide pile crown beam construction embedded part pre-embedding, retaining wall earth excavation inter-pile soil cleaning, retaining wall construction equipment installation operation, circular construction of retaining wall inter-pile plate vertical first mold construction to Nth mold construction, retaining wall construction equipment horizontal movement to a next retaining wall construction section, and repeating the operation of the sixth step to the eighth step until construction is completed. And the retaining wall building equipment is dismantled, and the building construction operation of the retaining wall is completed. The retaining wall building equipment replaces traditional construction of the retaining wall inter-pile plates through a wood mold and a steel pipe operation frame, safety is good, construction quality is good, the number of times of formwork turnover is high, loss is small, turnover circulation can be achieved rapidly, the modulus is adjustable, certain adaptability is achieved, plant formwork construction labor input is reduced, the construction cost of the retaining wall inter-pile plates is reduced, the construction period is shortened, and the construction efficiency is improved. And the industrial construction level of the retaining wall inter-pile plate is improved.
本发明公开了一种基于挡墙建造设备及挡墙施工方法,涉及建筑施工技术,包括挡墙抗滑桩施工、抗滑桩冠梁施工预埋件预埋、挡墙土方开挖桩间土清理、挡墙建造装备安装作业、挡墙桩间板竖向第一模施工至第N模的循环施工、挡墙建造装备水平移动至下一挡墙施工段、重复上述步骤六至骤八的操作直至施工完成、拆除挡墙建造装备总计九个操作步骤,完成挡墙的建造施工作业。本发明通过挡墙建造装备代替传统木模加钢管操作架挡墙桩间板施工,安全性好、施工质量好、模板周转次数高损耗少,可快速周转循环,模数可调,具有一定适应性的,减少厂房模架施工人工投入,节约挡墙桩间板施工成本及施工周期,提高挡墙桩间板工业化建造水平。
Retaining wall building equipment and retaining wall construction method
一种基于挡墙建造设备及挡墙施工方法
LUO JIE (author) / XIA JIANPING (author) / REN RUI (author) / XIONG TIANXIANG (author) / YANG YANHUI (author)
2024-05-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated retaining wall unit, retaining wall and construction method of retaining wall
European Patent Office | 2024
|Ecological building block, retaining wall and construction method of retaining wall
European Patent Office | 2022
|European Patent Office | 2024
|European Patent Office | 2023
|