A platform for research: civil engineering, architecture and urbanism
Integrated lifting climbing frame and construction technology thereof
The invention relates to the technical field of building construction, and discloses an integrated lifting climbing frame and a construction technology thereof.The integrated lifting climbing frame comprises multiple sets of lifting guide mechanisms and multiple frame bodies, the multiple sets of lifting guide mechanisms and the multiple frame bodies are arranged in a one-to-one correspondence mode, and each set of lifting guide mechanism comprises a guide rail and multiple wall-attached supports; the wall-attached supports are arranged on a building wall, the guide rails are fixedly connected with the corresponding frame bodies, the guide rails are slidably connected to the wall-attached supports, the frame bodies arranged at intervals are each provided with a pushing mechanism, the frame body provided with the pushing mechanisms is marked as a first frame body, and the frame body provided with the pushing mechanisms is marked as a second frame body. And the frame bodies without the pushing mechanisms are marked as second frame bodies, each pushing mechanism is connected with two adjacent second frame bodies, and the pushing mechanisms are used for pushing the adjacent second frame bodies to move upwards. The lifting device has the effect of improving the lifting operation convenience of the climbing frame.
本申请涉及建筑施工技术的领域,公开了一种集成式升降爬架及其施工工艺,其包括多组升降导向机构和多个架体,多组所述升降导向机构与多个所述架体一一对应设置,每组所述升降导向机构均包括导轨和多个附墙支座,每个所述附墙支座均设置在建筑墙体上,所述导轨与其对应的所述架体固定连接,所述导轨滑动连接在多个所述附墙支座上,每个相互间隔设置的所述架体上均设置有顶推机构,设置有所述顶推机构的架体记为第一架体,未设置所述顶推机构的架体记为第二架体,每组所述顶推机构均与其相邻的两个所述第二架体连接,所述顶推机构用于推动其相邻的所述第二架体上移。本申请具有提高爬架升降操作便捷性的效果。
Integrated lifting climbing frame and construction technology thereof
The invention relates to the technical field of building construction, and discloses an integrated lifting climbing frame and a construction technology thereof.The integrated lifting climbing frame comprises multiple sets of lifting guide mechanisms and multiple frame bodies, the multiple sets of lifting guide mechanisms and the multiple frame bodies are arranged in a one-to-one correspondence mode, and each set of lifting guide mechanism comprises a guide rail and multiple wall-attached supports; the wall-attached supports are arranged on a building wall, the guide rails are fixedly connected with the corresponding frame bodies, the guide rails are slidably connected to the wall-attached supports, the frame bodies arranged at intervals are each provided with a pushing mechanism, the frame body provided with the pushing mechanisms is marked as a first frame body, and the frame body provided with the pushing mechanisms is marked as a second frame body. And the frame bodies without the pushing mechanisms are marked as second frame bodies, each pushing mechanism is connected with two adjacent second frame bodies, and the pushing mechanisms are used for pushing the adjacent second frame bodies to move upwards. The lifting device has the effect of improving the lifting operation convenience of the climbing frame.
本申请涉及建筑施工技术的领域,公开了一种集成式升降爬架及其施工工艺,其包括多组升降导向机构和多个架体,多组所述升降导向机构与多个所述架体一一对应设置,每组所述升降导向机构均包括导轨和多个附墙支座,每个所述附墙支座均设置在建筑墙体上,所述导轨与其对应的所述架体固定连接,所述导轨滑动连接在多个所述附墙支座上,每个相互间隔设置的所述架体上均设置有顶推机构,设置有所述顶推机构的架体记为第一架体,未设置所述顶推机构的架体记为第二架体,每组所述顶推机构均与其相邻的两个所述第二架体连接,所述顶推机构用于推动其相邻的所述第二架体上移。本申请具有提高爬架升降操作便捷性的效果。
Integrated lifting climbing frame and construction technology thereof
一种集成式升降爬架及其施工工艺
TIAN CHANGBIN (author) / LI XUE (author) / CHANG ZIJIAN (author) / YANG SHAOPENG (author) / LU MINGMING (author)
2024-05-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Climbing frame lifting system and lifting method thereof
European Patent Office | 2021
|Climbing frame and unloading platform integrated lifting device
European Patent Office | 2024
|