A platform for research: civil engineering, architecture and urbanism
Composite support mold body for large-span beam and slab concrete pouring construction
The invention relates to the technical field of building construction, and provides a large-span beam and slab concrete pouring construction composite support mold body which comprises a cross-shaped support, two first mold plates are arranged at the top of the cross-shaped support, the two first mold plates are oppositely arranged, and four second mold plates are arranged at the top of the cross-shaped support. The four second templates are located on the two sides of the first template in pairs, a first adjusting assembly and a second adjusting assembly are arranged on the cross-shaped support, the first template is fixedly installed on the cross-shaped support through the first adjusting assembly, and the second templates are fixedly installed on the cross-shaped support through the second adjusting assembly; by means of the adjusting assembly, the first formwork, the second formwork, the second adjusting assembly and the connecting assembly, the width and other sizes of the device can be adjusted according to the construction pouring requirement, concrete of various types can be poured, practicability and universality are improved, and the concrete pouring requirement can be met.
本发明涉及建筑施工技术领域,提出了一种大跨度梁板砼浇筑施工复合支架模体,包括十字支架,十字支架的顶部设置有两个第一模板,且两个第一模板之间对立相设置,十字支架的顶部设置有四个第二模板,且四个第二模板两两一组位于第一模板的两侧,十字支架上分别设置有第一调整组件与第二调整组件,且第一模板通过第一调整组件固定安装在十字支架上,第二模板通过第二调整组件固定安装在十字支架上,通过设置的调整组件、第一模板、第二模板、第二调整组件与连接组件,使得该装置的宽度等尺寸能够根据施工浇筑需求进行调节,从而能浇筑出多种型号的混凝土,进而既提高了实用性与通用性,又能够满足混凝土浇筑的要求。
Composite support mold body for large-span beam and slab concrete pouring construction
The invention relates to the technical field of building construction, and provides a large-span beam and slab concrete pouring construction composite support mold body which comprises a cross-shaped support, two first mold plates are arranged at the top of the cross-shaped support, the two first mold plates are oppositely arranged, and four second mold plates are arranged at the top of the cross-shaped support. The four second templates are located on the two sides of the first template in pairs, a first adjusting assembly and a second adjusting assembly are arranged on the cross-shaped support, the first template is fixedly installed on the cross-shaped support through the first adjusting assembly, and the second templates are fixedly installed on the cross-shaped support through the second adjusting assembly; by means of the adjusting assembly, the first formwork, the second formwork, the second adjusting assembly and the connecting assembly, the width and other sizes of the device can be adjusted according to the construction pouring requirement, concrete of various types can be poured, practicability and universality are improved, and the concrete pouring requirement can be met.
本发明涉及建筑施工技术领域,提出了一种大跨度梁板砼浇筑施工复合支架模体,包括十字支架,十字支架的顶部设置有两个第一模板,且两个第一模板之间对立相设置,十字支架的顶部设置有四个第二模板,且四个第二模板两两一组位于第一模板的两侧,十字支架上分别设置有第一调整组件与第二调整组件,且第一模板通过第一调整组件固定安装在十字支架上,第二模板通过第二调整组件固定安装在十字支架上,通过设置的调整组件、第一模板、第二模板、第二调整组件与连接组件,使得该装置的宽度等尺寸能够根据施工浇筑需求进行调节,从而能浇筑出多种型号的混凝土,进而既提高了实用性与通用性,又能够满足混凝土浇筑的要求。
Composite support mold body for large-span beam and slab concrete pouring construction
一种大跨度梁板砼浇筑施工复合支架模体
YUN KUN (author) / FENG JIAQIAN (author) / LI ZHIZHOU (author) / QIN YAHUI (author) / XIE WENHAO (author) / FAN WENJUAN (author)
2024-05-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel-concrete composite beam bridge deck slab pouring construction tool and construction method
European Patent Office | 2021
|Formwork and construction method for concrete pouring of concrete slab-steel truss composite beam
European Patent Office | 2024
|Concrete pouring construction method for span beam inclined plane structure
European Patent Office | 2021
|Mold system for support-free construction of large-span floor slab and construction method
European Patent Office | 2023
|